126
10. Test Time: Show the time when it has been already finished the test.
11. Arima: Company Mark, if double click this mark and input the password , will appear a window
it can set the equipment_config.txt for RD.
12. Start: Begin to run the test; it will appear a window that can input Bar Code. After input the Bar
Code, it will begin to run the test.
13. Quit: Close the APT program.
14. Pass: Count the quantity of Pass at present, if reopens the program it will calculate again.
15. Total: Count and quantity of test at present, if reopens the program it will calculate again.
16. Result: Show the test result at present.
17. Error: It will show the fist fail message.
18. The state bar:
1.
Total: Count the quantity of test at present.
2.
Fail: Count Fail quantity at present.
3.
Pass Rate %: Count the probability of Pass at present.
4.
Average Test Time: Count and test time equally at present.
5.
Time at present.
Summary of Contents for GB115
Page 13: ...13 3 TECHNICAL BRIEF 3 1Digital Main Processor Figure 3 1 PMB7890 FUNCTIONAL BLOCK DIAGRAM ...
Page 32: ...32 3 9 LCD Interface Figure 3 9 1 LCD Interface Figure 3 9 2 Charging PUMP Interface ...
Page 33: ...33 LCD Interface Pin Function Charging PUMP Pin Function ...
Page 34: ...34 3 10 SIM Card Interface Figure 3 10 SIM CARD Interface ...
Page 35: ...35 3 11 KEYPAD Interface Figure 3 11 KEY PAD Interface ...
Page 38: ...38 3 14 Micro SD Interface ...
Page 40: ...40 Circuit Diagram TP1 TP6 TP3 TP4 TP2 TP5 ...
Page 42: ...42 4 2 SIM Card Trouble Test Point Circuit Diagram ...
Page 44: ...44 4 3 Vibrator Trouble Test Point Circuit Diagram ...
Page 46: ...46 4 4 Keypad Trouble Test Point Circuit Diagram ...
Page 47: ...47 Checking Flow Change Metal Dome Check Metal Dome Start Change PCB NG OK ...
Page 48: ...48 4 5 RTC Trouble Test Point Circuit Diagram ...
Page 50: ...50 4 6 Key Backlight Trouble 1 1 1 Test Point ...
Page 51: ...51 Circuit Diagram ...
Page 53: ...53 4 7 LCM Backlight Trouble Test Point Circuit Diagram ...
Page 55: ...55 4 8 LCM Trouble Test Point Circuit Diagram ...
Page 57: ...57 4 9 Microphone Trouble Test Point Circuit Diagram ...
Page 59: ...59 4 10 Receiver Trouble Test Point Circuit Diagram ...
Page 61: ...61 4 11 Speaker Trouble Test Point Circuit Diagram ...
Page 63: ...63 4 12 Headphone Trouble Test Point ...
Page 64: ...64 Circuit Diagram TP1 TP2 ...
Page 67: ...67 4 13 Charging Trouble Test Point Circuit Diagram ...
Page 69: ...69 4 14 FM Radio Trouble Test Point ...
Page 70: ...70 ...
Page 71: ...71 Circuit Diagram ...
Page 75: ...75 4 15 Camera Trouble Test Pointer TP1 TP2 TP3 ...
Page 76: ...76 Circuit Diagram ...
Page 78: ...78 4 16 Micro SD Trouble Test Pointer TP1 ...
Page 83: ...83 RX Trouble CIRCUIT ...
Page 86: ...86 CIRCUIT ...
Page 88: ...88 TX Trouble CIRCUIT ...
Page 91: ...91 CIRCUIT ...
Page 93: ...93 5 DOWNLOAD 5 1 Download Setup ...
Page 102: ...102 DownLoad success DownLoad Pass will display green color Fig 11 Download success ...
Page 105: ...105 Don t choose is normal idle mode ...
Page 106: ...106 6 BLOCK DIAGRAM ...
Page 107: ...107 7 CIRCUIT DIAGRMA ...
Page 108: ...108 ...
Page 109: ...109 ...
Page 110: ...110 ...
Page 111: ...111 ...
Page 112: ...112 ...
Page 113: ...113 8 BGA IC PIN Check 8 1 BGA PIN Check of MCU PMB7890 No NC pin ...
Page 114: ...114 8 2 BGA PIN Check of Memory ...
Page 115: ...115 8 3 BGA PIN Check of Camera driver AIT701A No NC pin ...
Page 116: ...116 9 PCB LAYOUT ...
Page 139: ...139 13 EXPLODED VIEW REPLACEMENT PART LIST 13 1 EXPLODED VIEW ...
Page 140: ...140 ...