23
INSTALLATION
ENGLISH
Four-Wire Power Cord
•
A 4-wire connection is required
for all mobile and manufactured
home installations, as well as all
new construction after January 1,
1996.
•
A UL-listed strain relief is required.
•
Use a 30-amp, 240-volt, 4-wire,
UL-listed power cord with #10
AWG-minimum copper conductor
and closed loop or forked
terminals with upturned ends.
1
Remove the terminal block access cover on
the upper back of the dryer.
2
Install a UL-listed strain relief into the power
cord through-hole.
3
Thread a 30-amp, 240-volt, 4-wire, UL-listed
power cord with #10 AWG-minimum copper
conductor through the strain relief.
Terminal Block
UL-Listed Strain
Relief
UL-Listed 4-Wire Power Cord
4
Transfer the dryer’s ground wire from behind
the green ground screw to the center screw of
the terminal block.
5
Attach the two hot leads of the power cord to
the outer terminal block screws.
6
Attach the white neutral wire to the center
screw of the terminal block.
7
Attach the power cord ground wire to the
green ground screw.
8
Tighten all screws securely.
9
Reinstall the terminal block access cover.
Ground
Screw
Power Cord
Ground Wire
Hot (Black) Neutral (White)
Hot (Red)
White Wire
moved from
Ground Screw
Summary of Contents for DLE3400 Series
Page 51: ...51 MEMO ...
Page 52: ...52 MEMO ...
Page 104: ...52 NOTAS ...
Page 105: ...53 NOTAS ...
Page 106: ...54 NOTAS ...
Page 107: ...55 NOTAS ...
Page 108: ......