11
INSTALLATION
ENGLISH
INSTALLATION
Before Installing
Installation Overview
Please read the following installation instructions first after purchasing this dryer or transporting it to
another location.
a
Choose the proper location.
b
Level the appliance.
c
Vent the appliance.
d
Connect the inlet hose (for steam models)
e
Connect the Gas / Electric dryer.
• Purchase a UL-listed, 3-wire or 4-wire power cord kit with UL-listed strain relief (electric dryer only)
f
Plug in the power cord.
g
Installation test and test run.
• Refer to the
Test Exhaust System
section in
INSTALLATION
.
Summary of Contents for DL X670 Series
Page 32: ...32 OPERATION Low No Heat Air Heat Setting Label Directions ...
Page 61: ...61 Memo ...
Page 62: ...62 Memo ...
Page 63: ...63 Memo ...