![LG Code Zero A9 Series Manual Download Page 31](http://html.mh-extra.com/html/lg/code-zero-a9-series/code-zero-a9-series_manual_221523031.webp)
-31-
Disassembly, assembly and repairing of main parts
5. How to disassemble the inlet motor(floor inlet)
(1) Disassemble the inlet
roller (Refer to how to
disassemble the in-
letroller in details)
(2) Remove the cover of the
right bump with a hand.
(3) Remove 4 screws in the
red circle.
(4) Remove the cover below
the inlet after removing
the 4 screws.
(5) Remove the bump in the
figure with a hand.
(6) Remove the top cover of
the inlet.
(7) Remove the inlet motor.
(8) Remove the motor
harness connector and
replace the motor.
(9) Reassemble the whole part
in the reverse sequence.
Summary of Contents for Code Zero A9 Series
Page 38: ... 38 Circuit diagram Station PCB ...
Page 39: ... 39 Circuit diagram Main PCB Mop Nozzle Motor PCB Mop Nozzle ...
Page 40: ... 40 Circuit diagram Main PCB Power ...
Page 41: ... 41 Circuit diagram Micom ...
Page 42: ... 42 Circuit diagram Inverter ...
Page 49: ... 49 Exploded diagram A9 Base Assembly Body EBR801 AAN701 ...
Page 50: ... 50 Exploded diagram A9 Base Assembly Lower AAN801 ...
Page 52: ... 52 Exploded diagram A9 EAY401 EAC201 EBZ001 AGR201 AGR301 ...
Page 53: ... 53 Exploded diagram A9 AGB403 Power Punch Nozzle ...
Page 54: ... 54 Exploded diagram A9 Carpet Nozzle AGB402 AHR702 AGM002 EAD902 ...
Page 55: ... 55 Exploded diagram A9 Power Drive Mini Nozzle AGB405 ...
Page 56: ......