TEST RUNNING
15
ENGLISH
Hand over
Teach the customer the operation and mainte-
nance procedures, using the operation manual
(air filter cleaning, temperature control, etc.).
After the confirmation of the above condi-
tions, prepare the wiring as follows:
• Never fail to have an individual power
specialized for the air conditioner. As
for the method of wiring, be guided by
the circuit diagram pasted on the inside
of control box cover.
• Provide a circuit breaker switch be-
tween power source and the unit.
• The screw which fasten the wiring in
the casing of electrical fittings are liable
to come loose from vibrations to which
the unit is subjected during the course
of transportation. Check them and
make sure that they are all tightly fas-
tened. (If they are loose, it could give
rise to burnout of the wires.)
• Specification of power source.
• Confirm that electrical capacity is suffi-
cient.
• Be sure that the starting voltage is
maintained at more than 90 percent of
the rated voltage marked on the name
plate.
• Confirm that the cable thickness is as
specified in the power sources specifi-
cation.
(Particularly note the relation between
cable length and thickness.)
• Never fail to equip a leakage breaker
where it is wet or moist.
• The following troubles would be caused
by voltage drop-down.
- Vibration of a magnetic switch, dam-
age on the contact point there of, fuse
breaking, disturbance to the normal
function of a overload protection de-
vice.
- Proper starting power is not given to
the compressor.
• Use only 1 remote-controller contained
in indoor unit, when you combine to
use both ceiling suspended type indoor
unit and different Indoor units combina-
tions.
CAUTION
!
Summary of Contents for AVNQ36GM1A0
Page 55: ......