17
ENGLISH
• Header should be insulated with the insulator in each kit.
• Joints between branch and pipe should be sealed with the tape in-
cluded in each kit.
• Any cap pipe should be insulated using the insulator provided with
each kit and then taped as described above.
Insulate the header using
the insulation
material attached to the
branch pipe kit
as shown in the figure.
Insulator
Insulator of field pipe
Tape
Tape
Cap pipe
Insulator for cap pipe
Y branch pipe
Models
Gas pipe
Liquid pipe
ARBLN
01621
I.D19.0 5
O.D15.88
I.D12. 7
I.D15.88
I.D12. 7
I.D15.88
I.D15.88
I.D12. 7
292
281
74
70
I.D12. 7
O.D9.52
I.D6.
3
5
I.D9.52
I.D.9.52
I.D.6.
3
5
I.D9.52
I.D.6.
3
5
292
281
74
70
1
1
ARBLN
03321
I.D25.4
41
3
3
90
8
3
I.D15.88
I.D19.0 5
I.D12. 7
I.D12. 7
I.D19.0 5
I.D15.88
I.D19.0 5
I.D22.2
I.D28.58
O.D25.4
I.D22.2
O.D19.0 5
O.D19.0 5
I.D22.2
I.D25.4
70
80
11 0
1
2
3
3
1
2
70
I.D9.52
I.D12. 7
5
3
.
6
D
.
I
2
5
.
9
D
.
I
I.D9.52
I.D12. 7
I.D6.
3
5
I.D12. 7
33
2
3
21
74
I D19 0 5
ARBLN
07121
3
76
404
96
I.D
3
4.9
O.D
3
1. 8
I.D22.2
O.D22.2
I.D28.58
I.D
3
1. 8
O.D19.0 5
I.D28.58
120
90
120
I.D
3
1. 8
2
.
2
2
D
.
I
8
5
.
8
2
D
.
I
I.D19.0 5
I.D15.88
I.D12. 7
I.D19.0 5
I.D15.88
2
3
1
2
1
3
2
5
.
9
D
.
I
2
5
.
9
D
.
I
7
.
2
1
D
.
O
I.D15.88 I.D19.0 5
I.D12. 7
I.D12. 7
I.D19.0 5
I.D15.88
I.D12. 7
I.D19.0 5
O.D12. 7
I.D6.
3
5
I.D15.88
3
71
3
94
8
3
11 0
70
2
3
3
2
ARBLN
14521
120
90
120
471
517
125
120
1
3
0
I.D19.0 5
I.D15.88
I.D12. 7
I.D19.0 5
I.D22.2
I.D41.
3
I.D
3
8.1
I.D41.
3
O.D
3
4.9
I.D
3
4.9
I.D
3
4.9
I.D22.2
I.D28.58
I.D28.58
I.D
3
8.1
I.D41.
3
I.D
3
4.9
I.D
3
8.1
O.D22.2
O.D
3
8.1
O.D15.88
O.D28.58
90
2
3
3
3
2
2
3
416
444
96
O.D15.88
I.D9.52
I.D12. 7
O.D12. 7
I.D6.
3
5
I.D9.52
I.D15.88
I.D19.0 5
I.D22.2
I.D22.2
I.D19.0 5
I.D15.88
I.D12. 7
I.D15.88
I.D19.05
I.D22.2
O.D19.0 5
80
11 0
11 0
2
3
1
2
3
3
ARBLN
23220
O.D.28.58
I.D.22.2
115
X2
100
O.D15.88
I.D12.7
70
O.D.22.2
I.D.15.88
I.D.19.05
120
O.D.
3
8.1
I.D.
3
4.9
I.D.28.58
O.D.44.48
X2
175
I.D
3
1.8
I.D.5
3
.98
I.D.25.4
I.D.44.48
I.D.44.48
I.D
3
8.1
I.D41.
3
I.D.44.48
I.D
3
8.1
I.D41.
3
I.D.5
3
.98
420
490
1
3
4
1
2
3
3
2
3
3
3
3
2
O.D.19.05
I.D.12.7
I.D.15.88
O.D12.7
I.D6.
3
5
I.D9.52
X2
110
110
I.D25.4
I.D22.2
I.D.19.05
I.D.19.05
I.D.22.2
I.D.25.4
I.D.25.4
I.D.22.2
3
46
3
79
96
2
3
3
2
3
[unit:mm]
[unit:mm]
Leak test
Leak test should be made by pressurizing nitrogen gas to 3.8
MPa(38.7kgf/cm
2
). If the pressure does not drop for 24 hours, the sys-
tem passes the test. If the pressure drops, check where the nitrogen
leaks. For the test method, refer to the following figure. (Make a test
with the service valves closed. Be also sure to pressurize liquid pipe,
gas pipe and high/low pressure common pipe)
The test result can be judged good if the pressure has not be reduced
after leaving for about one day after completion of nitrogen gas pres-
surization.
Indoor unit
Nitrogen gas
cylinder
Slave 1 outdoor unit
Master outdoor unit
Liquide pipe
Gas pipe
Liquide pipe
Gas pipe
Liquid side
Gas side
Close
Close
Close
Close
Leak Test and Vacuum drying
Header
Models
Gas pipe
Liquid pipe
4 branch
ARBL054
120
150
3
60
120
ID15.88
ID12.7
ID12.7
ID15.88
ID15.88
ID19.05
120
120
150
3
60
ID9.52
ID9.52
ID6.
3
5
ID6.
3
5
ID9.52
ID12.7
7 branch
ARBL057
540
ID15.88
ID19.05
120
150
120
ID15.88
ID12.7
ID15.88
ID12.7
ID15.88
ID19.05
540
ID9.52
ID12.7
120 150
120
ID6.
3
5
ID9.52
ID9.52
ID12.7
4 branch
ARBL104
120
150
400
160
ID15.88
ID12.7
ID19.05
ID15.88
ID22.2
ID28.58 ID25.4
120
120
150
3
60
ID9.52
ID9.52
ID6.
3
5
ID6.
3
5
ID9.52
ID12.7
7 branch
ARBL107
120
150
160
580
ID19.05
ID15.88
ID15.88
ID12.7
ID22.2
ID28.58 ID25.4
120
150
700
120
ID6.
3
5
ID9.52
ID9.52
ID6.
3
5
ID9.52
ID12.7
10 branch
ARBL1010
120
150
160
760
ID19.05
ID15.88
ID15.88
ID12.7
ID22.2
ID28.58
ID25.4
120
150
160
760
ID19.05
ID15.88
ID15.88
ID12.7
ID22.2
ID28.58
ID25.4
10 branch
ARBL2010
120
150
182
775
ID19.05
ID15.88
ID15.88
ID12.7
ID28.58
ID
3
1.8
ID
3
4.9
120
150
107
60*9=540
700
ID6.
3
5
ID9.52
ID19.05
ID15.88
ID9.52
ID6.
3
5