
46
Multi V W
all-Mounted Indoor Unit
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. “LG” is a registered trademark of LG Corp.
Drain Leak Test
A leak test should be performed 24 hours after the drainage system
has been installed.
1.
/LIWXS6WDQGDUGDQG$UW&RRO0LUURU>*HQ@,QGRRU8QLWVDQG
RUUHPRYH$UW&RRO*DOOHU\>*HQ@$UW&RRO0LUURU>*HQ@
Indoor Units) the picture or front panel from the indoor unit
chassis (A).
2.
5HPRYHDQ\ILOWHUV
3. Manually set the up-and-down air direction louvers to the horizon-
WDOSRVLWLRQ6WDQGDUGDQG$UW&RRO0LUURU>*HQDQG@,QGRRU
Units).
4.
5HPRYHWKHVFUHZVWKDWVHFXUHWKHIURQWPHWDOSDQHO$UW&RRO
Gallery [Gen 4]) or front panel to the indoor unit (Standard and
$UW&RRO0LUURU>*HQDQG@,QGRRU8QLWV3XOOWKHORZHUOHIWDQG
right sides of the panel toward you and lift the panel off. (Stan-
GDUGDQG$UW&RRO0LUURU>*HQDQG@,QGRRU8QLWV
5.
3RXUDJODVVRIZDWHURQWKHHYDSRUDWRU$UW&RRO*DOOHU\>*HQ@6WDQGDUGDQG$UW&RRO0LUURU>*HQDQG@,QGRRU8QLWV%
6. Verify the water flows correctly through the indoor unit drain hose to the drainage system without any leaks at the hose connections (B).
Front Panel
Drain Pan
Drain
Hose
Check for Leaks
Drain Hose Connection
Check for Leaks
A
B
Figure 43: Gallery Indoor Unit
'UDLQ/HDN7HVW
B
Figure 44: Wall-Mounted Indoor
8QLW'UDLQ/HDN7HVW
Finishing Installation — Gallery Indoor Units
%HIRUHFRPSOHWLQJLQVWDOODWLRQWKHSLFWXUHDQGIURQWPHWDOSDQHOVRIWKH*DOOHU\LQGRRUXQLWPXVWEHUHLQVWDOOHG%HIRUHUHLQVWDOOLQJYHULI\
that communications cable and power wiring between the outdoor and indoor units are connected.
1.
&KHFNLIWKHVLGHFRYHULVDVVHPEOHGSURSHUO\HVSHFLDOO\LIDNQRFNRXWKROHIRUWKHSLSLQJLVXVHG
2. Verify if the drain hose and refrigerant piping is routed correctly from the side and the rear of unit.
3.
5RXWHWKHSRZHUZLULQJWKURXJKWKHLQGRRUXQLW¶VERWWRPOHIWKDQGJURRYH6WHS
4.
0DNHWKHFRQQHFWLRQVWRWKHFRPPXQLFDWLRQ3&%FRQQHFWRUDQGWRWKHIURQWSDQHOFRQQHFWRU6WHS
5.
$WWDFKWKHWRSSDUWRIWKHIURQWPHWDOSDQHODOLJQLQJLWZLWKWKHVFUHZKROHVDWWKHERWWRP6WHSDQGWKHQVHFXUHWKHIURQWPHWDOSDQHO
with the factory-supplied screws.
6. Suspend the hooks of the picture panel in the bottom grooves (Step 4).
Step 1
Comm. PCB
Connector
Front Panel
Connector
Comm. PCB
Connector
Step 2
Step 3
Step 4
Figure 45: Finishing Gallery Indoor Unit Installation
CONDENSATE PIPING / FINAL INSTALL