- 67 -
Copyright © 2009 LG Electronics. Inc. All right reserved.
Only for training and service purposes
LGE Internal Use Only
5. TROUBLE SHOOTING
5. TROUBLE SHOOTING
5.1 Trouble shooting test setup
Equipment setup
Power on all of test equipment
-Connect PIF-UNION JIG or dummy battery to the DUT for power up.
-Connect mobile switch cable between Communication test set and DUT when you need to make a
phone call.
-Follow trouble shooting procedure