background image

07

Parallel Connection

The solar modules may be combined in parallel to 

produce the desired current output.

When modules are combined in parallel, the total 

current is equal to the sum of currents from each 

module. 

The voltage of each module connected in parallel 

should be the same. 

When connecting plural strings of modules in parallel 

every series string or solar module must be fused prior

to combining with other strings. 

Abide with all applicable federal, state, and local codes

for additional fusing requirements and limitations on 

the maximum number of solar modules in parallel.

Maximum series fuse rating is refer to “Product 

for the protection of the module and cables from over-

current for prevention of unbalanced string voltage.

A multiplying factor is required for increased output 

of the PV modules. Under normal conditions, a PV 

module is likely to experience conditions that produce 

more current and/or voltage than reported at standard 

test conditions. The requirements of the National 

Electrical Code (NEC) in Article 690 shall be followed 

to address these increased outputs. In installations 

not under the requirements of the NEC, the values 

of Isc and Voc marked on this PV module should 

be multiplied by a factor of 125% when determining 

component voltage ratings, conductor ampacities, 

fuse sizes, and size of controls to the PV output.

Depending on national directives, additional safety 

factors might be applicable for over current protection.

Earth Grounding 

All work must be conducted in conformance with all 
Federal, State, and local codes and standards.

Grounding works should be performed by an 
authorized installer for the safety and maintenance of 
the system in accordance with all national, state and 
local electrical codes and regulations and standards.

and location of grounding holes is provided in “Product

One M4 stainless steel bolt, one nut, one spring 

washer and 12 AWG Cu wires are recommended per
mounting hole. 

Where common grounding hardware (nut, bolts, 
washers) is used to attach a listed grounding device, 
the attachment must be made in conformance with the
grounding device manufacturer’s instructions.

All hardware should be consist of corrosion resistant 
material such as stainless steel.

There is an earth hole on the edge of the module 
frame. Using this hole, an earth conductor and the 
solar module frame may be recommended to be 
connected and earthed as the below drawing. 

All screws and nuts shall be tightened to a torque of 

To prevent electric shock and fire, a protective ground
must be done on the frames of solar modules and arrays

safety class II. The national directives must be respected.

although the solar modules from LG meet the conditions of

4~5 N∙m.

Module frame

Bolt

Flat washer
Star washer

Cup washer

Grounding wire

Spring washer

Nut

Flat washer

Specifications; page 11”.

Parallel configuration is not limited if proper measures

are taken to block the reverse current flow, e.g. fuses

Parallel connection for more current

-

+

…………

+

-

+

-

-

+

-

+

General Wiring

LG Electronics recommends that all wiring be double 

insulated with a minimum rating of 90°C (194°F). 


The minimum size should be determined by the 

applicable codes. 

LG Electronics recommends a size no smaller than 

4mm  .

2

All wiring should use a flexible copper (Cu) conductor.

Specific information on the solar module dimensions

Specifications”.

washer, two flat washers, one cup washer, one star

Summary of Contents for 310N1T-V5

Page 1: ...Please read this manual carefully before operating your set and retain it for future reference N TYPE MODELS LGXXXN1T V5 LGXXXN2T V5 www lg solar com Installation manual PV Solar MODULE MFL70700907 ...

Page 2: ...onnection 07 General Wiring 07 Earth Grounding 07 MECHANICAL INSTALLATION 08 Module Mounting 08 Site Consideration 08 Mounting Methods 08 DISCLAIMER OF LIABILITY DISPOSAL 10 TRANSPORTING AND STORAGE 10 REVISIONS TABLE 10 PRODUCT SPECIFICATIONS 11 Electrical Mechanical Properties 11 Dimensions of Modules 12 Mechanical Installation methods Bolting Clamp Information Unloading Flow Guide 13 15 16 APPE...

Page 3: ...ed modules must be treated with safety protection equipment Failure to comply may result in serious bodily injury or death No electrical parts like cables are located after installation between laminate and mounting structure Do Not reconnect or repair junction box cable It may occur spark or electric shock Do not bending junction box s cable While under stress it may occur module damage Cable ben...

Page 4: ...the junction box of the module or pull the cable Do not remove the labels attached to the module Failure to comply may result in damage of the product If the installing modules on curved surface e g arch type as shown in the below picture do not forcefully modify the module in the installation when connecting it with the structure Only install the module in the place where the structure for the pa...

Page 5: ...icro fiber cloth can be used for regular washing or It may result in a burn or injury Do not disassemble the solar module After installation or repair check that the solar module are operating properly In the event that the currently used solar module or parts have been replaced the newly replaced module and parts must have the same model name and parts as the previously installed solar module Do ...

Page 6: ...lar modules electrical connections Modules may be connected in series and or parallel to achieve the desired electrical output as long as it sheet Please use only the same type of modules in a combined source circuit Do not disconnect the module under when it is operating Shock hazard may occur near the solar modules connection means When the module installing in series or in parallel e g using fo...

Page 7: ...rks should be performed by an authorized installer for the safety and maintenance of the system in accordance with all national state and local electrical codes and regulations and standards and location of grounding holes is provided in Product One M4 stainless steel bolt one nut one spring washer and 12 AWG Cu wires are recommended per mounting hole Where common grounding hardware nut bolts wash...

Page 8: ... B A x Y Excluded Operating Environments The solar modules from LG Electronics can not be This mounting method is by using frame bolt holes The mounting rails must run perpendicularly to the module long side operated in a location where they could come in direct contact with salt water or ammonia Shadow LGE solar module should be installed in a proper site that there is no shadowing affected by bu...

Page 9: ...ch module should be securely fastened at a minimum 4 points on two opposite sides and location of mounting holes is provided in Product Tighten the bolt securely by using the combination Place the spring washer between the Flat washer and Nut Mounting by using clamps The module may be fastened to a support by using clamps on both the long edge and the short edge of the modules provided in Mechanic...

Page 10: ...he environment and human health Your old appliance may contain reusable parts that could be used to repair other products and other valuable materials that can be recycled to conserve limited resources 3 You can take your appliance either to the shop where you purchased the product or contact your local government waste office for details of your nearest authorized WEEE collection point For the mo...

Page 11: ... LG430N2T V5 MC4 20 40 2024 1024 20 3 405 0 3 49 8 10 26 41 9 9 68 16 1000 LG435N2T V5 MC4 20 40 2024 1024 20 3 410 0 3 49 9 10 30 42 3 9 71 16 Note MC4 formal name PV KST4 6II UR PV KBT4 6II UR Note The Typical change in module efficiency at 200W m in relation to 1000W m is 2 5 Min 3 0 should be selected according to the installation site conditions and local code Max No of modules in series is c...

Page 12: ...12 Dimensions of Modules 60Cell Module 72Cell Module Unit mm in ...

Page 13: ...0mm Front 2400Pa Rear 2400Pa Fig 5 Clamping Type Fig 6 Clamping Type A B B A C C B A A 200mm B 400mm Front 5400Pa Rear 4000Pa m m 0 2 1 A 4point Front 1800Pa Rear 1800Pa C 120mm Front 5400Pa Rear 1800Pa A 120mm m m 0 0 1 3 4 8 B 6point Front 5400Pa Rear 4000Pa Note All mechanical installation methods Fig 1 to Fig 6 in this appendix were not tested by VDE It is evaluated by LG internal test Mechani...

Page 14: ...g 5 Clamping Type Fig 6 Clamping Type A B B A C C B A A 250mm B 400mm Front 5400Pa Rear 3000Pa m m 0 2 1 A 4point Front 1600Pa Rear 1600Pa C 120mm Front 3600Pa Rear 1600Pa A 120mm m m 0 0 1 12 0 1 B 6point Front 5400Pa Rear 3000Pa All mechanical installation methods Fig 1 to Fig 7 and bolting method in this appendix were not tested by VDE e t o N It is evaluated by LG internal test Mechanical Inst...

Page 15: ...pring washer Nut Mounting Rail Four M8 5 16inch stainless steel bolts four nuts four spring washers and eight flat washers are recommended per solar module Bolting Method the modules Clamp system requirements Use corrosion resistant material clamps and hardware E G L y b y t i l i b i t a p m o c r o f t s e t o t s d e e n t i p m a l c l a i c e p s a e s u u o y f I The clamp should not be touc...

Page 16: ... Block Standard Line Rope The position of rope have to be between block 1 and block 2 when you fasten a rope to pallet If you have not timber bar you can use a pallet which is longer than module size The crane hook have to be placed center of packaging For the balance of packaging the rope between the packaging and crane must be the same length Step 3 Loading unloading packaging A minimum of two o...

Page 17: ...ea Contact solarinfo lge com http www lg solar com LG Electronics Deutschland GmbH Alfred Herrhausen Allee 3 5 65760 Eschborn Germany Contact service solar lge de LG LG logo and Life s Good are trademarks of LG Electronics Inc worldwide Trademarks and intellectual properties of LG Electronics Inc are protected by international copyright laws ...

Reviews: