Mounting
3-3
3
Rack Mounting
Before rack mounting the switch, pay particular attention to the following factors:
• Temperature: Since the temperature within a rack assembly may be higher than
the ambient room temperature, check that the rack-environment temperature is
within the specified operating temperature range (See page C-1.).
• Mechanical Loading: Do not place any equipment on top of a rack-mounted unit.
• Circuit Overloading: Be sure that the supply circuit to the rack assembly is not
overloaded.
• Grounding: Rack-mounted equipment should be properly grounded. Particular
attention should be given to supply connections other than direct connections to
the mains.
To rack-mount devices:
1.
Attach the brackets to the device using the screws provided in the Bracket
Mounting Kit.
Figure 3-2 Attaching the Brackets
Summary of Contents for LNGS8MP
Page 1: ...LG Nortel ELO GS8MP LNGS8MP Gigabit Ethernet Switch Installation Guide ...
Page 2: ......
Page 4: ...LNGS8MP January 2008 150000052200A Issue 1 0 ...
Page 6: ......
Page 14: ...viii ...
Page 24: ...Introduction 1 6 1 ...
Page 30: ...Network Planning 2 6 2 ...
Page 54: ...Specifications C 4 C ...
Page 61: ......
Page 62: ...JAN 2008 ISSUE 1 0 ...