3.
Installation
3.1
Installation materials
These installation materials shall be prepared by installers.
Charging cable
Network cable
Ground wire
RJ45 plug
Silicone sealant or putty
3.2
Installation location
Make sure that the installation location meets the following conditions:
The building is designed to withstand earthquakes.
The location is far away from the sea, to avoid salt water and humidity.
The floor is flat and level.
There are no flammable or explosive materials nearby.
The optimal ambient temperature is between 15 and 30°C.
The temperature and humidity stays at a constant level.
There is minimal dust and dirt in the area.
There are no corrosive gases present, including ammonia and acid vapor.