
Maintenance
68
130001398_002_C0 - 09/2016 - © Leybold
5.5 Service at Leybold
If you send a pump to Leybold indicate whether the pump is free of sub-
stances damaging to health or whether it is contaminated.
If it is contaminated also indicate the nature of the hazard. To do so, you
must use a preprinted form which we shall send to you upon request.
A copy of this form is reproduced at the end of these Operating Instructions:
“Declaration of Contamination of Compressors, Vacuum Pumps and
Components”. Moreover, you may download a suitable form from the
Internet: www.leybold.com
Documents
Download Documents.
Please attach this form to the pump or enclose it with the pump.
This “Declaration of Contamination” is required to meet the requirements of
German Law and to protect our personnel.
Leybold must return any pumps without a “Declaration of Contamination” to
the sender’s address.
Before packaging (respectively shipping) the pump it should, if possible, be
purged with inert gas, but as a minimum requirement it should be completely
emptied of all pumped substances.
The pump must be packed in such a way, that it will not be damaged duri-
ng shipping and so that any contaminants are not released from the
package.
Leybold is not in a position to perform servicing (repairs) and waste dispo-
sal of radioactively contaminated pumps. Both needs to be ensured from
the side of the user.
5.6 Maintenance Intervals
Service work
Interval
Check the oil level
Before switching on and monthly
Oil change for LVO 210
1 year
Oil change for PFPE
not required
Check oil quality visually
as required
In the normal state PFPE is light, clear and transparent.
LVO 210 is yellow, clear and transparent. In the case of
black oil an oil change is necessary,
Complete overhaul
Depending on the
in the service centre
specific operating conditions
Leak search
after all maintenance and
assembly work and upon request
RUVAC WH
U
: Replace
After 1 Mio pump down cycles
bypass valve
(Leybold Field Service)
CAUTION