
CABLE INSTALLATION - PREPARATION
Page 6 of 26
PK-93470-10-02-0A
Multi-Strand
Secure to Enclosure
Secure to Tray
Top View: Tray to Front
NOTE:
Tray in forward position, covers
and center bar removed for clarity.
NOTE:
• Route cable to tray through grommet on the opposite
side of cable entry.
• Plan for cable routing prior to termination.
• Adjust fiber ring kit based on desired application (see
page 7 for detail).
• Assure cable slack for tray movement.
• For additional cable slack management, use optional
Fiber Management Ring Kit (5R100-14R). See image
below for detail on placement.
To remove tray from enclosure, slide tray fully rearward, then
lift front pin to release the tray (pull to slide tray to the rear).
Pictured: Removable tray to facilitate field
termination and splicing
Pictured: Center bar removal - detail view
To remove center steel support bar, depress latch as
shown per arrow in diagram below.
NOTE:
• Do not remove bar
before installing
enclosure in rack.
• Center bar is required
for operation of the
removable covers.
• Replace center bar when
service is complete.