background image

Fig. 3

Fig. 5

Fig. 7

Fig. 6

Fig. 8

Fig. 4

Press until 

breaker snaps 

into place

Step 4: Phase, Neutral and Ground Conductors

WARNING: 

Use 

ONLY

 approved fittings and clamps to avoid 

damage to wires.

a.

  Bring the 

phase

neutral

 and 

ground

 conductors into the 

enclosure through the overhead conduit opening or a bottom 
feed knockout.

b.

  Connect the 

phase

neutral

 and 

ground

 conductors to the 

appropriate terminals and torque to spec in the terminations 
table 

(fig. 4).

Step 5: Branch Circuit Breakers
WARNING: 

Leviton

®

 circuit breakers 

MUST BE

 used with a 

Leviton

 circuit breaker enclosure.

a.

  Strip and connect the 

load phase (J)

 and 

load neutral (K)

 

wires to the 

load terminals (L)

 and ground wire to the 

ground 

bus (M)

 of the circuit breaker enclosure 

(fig. 5)

. Strip wires 

and torque load terminals to spec in the terminations table.

NOTE: 

Ensure that the main breaker is in the OFF position 

before installing any branch circuit breakers.

NOTE: 

Ensure that all branch circuit breakers are in the OFF 

position before installing into the panel.

b.

  Align the 

hooks and guides (N)

 of the branch circuit breaker 

with the panel and press until breaker snaps into place 

(fig. 6)

Step 6: Installing Deadfront

NOTE: Twist-outs (O)

 must be removed for each position that contains 

a branch circuit breaker. Fill any unused open spaces in cover using 
filler plates 

(see filler plate instructions)

.

a.

  To remove 

twist-outs (O)

, first strike with a screwdriver, then 

twist with pliers until detached 

(fig. 7)

.

b.

  Install 

deadfront (P)

 

by sliding it inward above the side wall 

protrusions on each side at a 45-degree angle until bottom portion 
of the 

deadfront (P)

 is seated into enclosure 

(fig. 8)

.

c.

  Secure the bottom of the 

deadfront (P)

 with the 

securing 

screw (Q)

.

d.

  Apply circuit directory labels on the back of the door.

e.

  Replace the meter and wiring compartment covers 

(See Step 1)

.

Step 7: Complete the Installation
WARNING: 

Before providing power to the load center, 

check all electrical connections and confirm that the wiring 

is correct.

WARNING: 

Replace all doors and covers before connecting 

power to this equipment.

a.

  Ensure that the main and all branch circuit breakers are in the OFF 

position. To energize, first turn ON the main breaker, and then turn 
ON each individual branch circuit breaker.

SAVE THESE INSTRUCTIONS

For Technical Assistance Call: 1-800-824-3005 (U.S.A. Only) 

1 800 405-5320 (Canada Only) www.leviton.com

PK-A3217-10-00-0A

© 2017 Leviton Mfg. Co., Inc.

Align hooks 

and guides (N)

Mount

i

ng

Knockouts

(F)

Ground

Bus

Neutr

a

l Term

i

n

a

l

Ph

a

se 

Term

i

n

a

ls

Ground

Term

i

n

a

l

Feed-Thru
Neutr

a

l Lug

Feed-Thru

Ph

a

se Lugs

Lo

a

d

term

i

n

a

ls

(L)

Lo

a

d neutr

a

l (K)

Lo

a

d ph

a

se (J)

Ground

Bus

(M)

TERMINATIONS

Termination Point

Wire Gauge

Strip Length

Torque

Meter Socket Phase & 
Neutral Terminals

   #6 AWG - 350 MCM

1.1 in.

200 in-lbs.

Feed-Thru Phase Lug    #6 AWG - 300 MCM

1.0 in.

375 in-lbs.

Feed-Thru Neutral  
Lug

   #14 AWG - #6 AWG 
   #4 AWG - 2/0 AWG

1.0 in. 
1.0 in.

30 in-lbs. 

120 in-lbs.

Ground Terminal

   #4 AWG - 2/0 AWG

0.75 in.

50 lb-ins.

Load Phase  
(brass)

   #8 AWG - #4 AWG 
   #14 AWG - #10 AWG

0.40 in. 
0.40 in.

45 in-lbs. 
35 in-lbs.

Load Neutral  
(silver)

   #8 AWG - #4 AWG 
   #14 AWG - #10 AWG

0.40 in. 
0.40 in.

45 in-lbs. 
35 in-lbs.

Ground Bus

   #6 AWG - #4 AWG 
   #8 AWG 
   #14 AWG - #10 AWG

0.50 in. 
0.50 in. 
0.50 in.

35 in-lbs. 
25 in-lbs. 
20 in-lbs.

Twist-outs

(O)

Deadfront

(P)

Securing screw (Q)

45˚

WEB 

VERSION

Reviews: