
21
3
Pair the Charging Stations
This section describes the steps needed to install labels, connect the DC conductors, and connect
Ethernet communication if the charging station is being paired.
If the Express 250 is being installed as a Standalone station, skip this section and continue to
.
Install New Labels
1.
Identify the ratings label area at the rear of the
charging station, just under the charging cable
swing arms.
2.
Peel the backing and the protective front strip
from the new ratings label. Affix the ratings label
over the top of the existing ratings. The new
label reflects the updates in charging station
capacity.
3.
Identify the two charging stations to be paired.
For each pair, check site plans to see which
charging station is designated Station 1 and
which is Station 2. If the plans do not define it,
designate them now.
4.
Affix the AC disconnect labels in the site’s main language to the disconnect responsible for AC
power to this charging station and the disconnect for its Paired partner.
5.
Using permanent marker, write in the last three numbers of both Paired stations’ serial number
(found next to the ratings) on each disconnect label, so that future technicians know which
disconnect to power off for service. This is especially important for sites with multiple pairs of
charging stations.
DANGER:
RISK OF SHOCK
.
Power must be disconnected at the service panel to BOTH
Express 250 paired charging stations when servicing. FAILURE TO CORRECTLY MARK
THIS FOR FUTURE TECHNICIANS CAN RESULT IN SERIOUS INJURY OR LOSS OF LIFE.
250_IGcombo.pdf 27
11/18/2019 3:37:41 PM