
CABLE INSTALLATION - PREPARATION
Page 6 of 30
DI-000-5RXUD-20A
Top View: Tray to Front
NOTE:
Tray in forward position, covers
are removed for clarity.
COMMENTS:
• Route cable to tray through grommet on the opposite
side of slide tray tie down point
• Assure cable slack for tray movement.
• Recommended trunk breakout length is 36 inches.
• A minimum of 20 inches of free slack is required to each
cassette for bend radius compliant accessibility from the
front side.
To remove tray from enclosure, slide tray fully forward
stop position. Press release lever and slide tray out to
remove.
Pictured: Removable tray to facilitate field
termination
Tray Release
To Remove a tray: (see diagram)
1. Pull the tray forward to the stop point
2. Press the release lever toward the outside of the
enclosure and remove the tray from the tray
guides.
To Install a tray:
A. Insert the tray into the target position
B. Slide the tray inward until the first stop point is
reached.
C. Press the release lever toward the outside of the
enclosure and continue sliding the tray inward to
the fully enclosed position.
Caution - Damage may occur to fiber cabling if tray is removed
beyond the stop point when loaded.