3-2
Installing the Switch
3
Figure 3-1 RJ-45 Connections
Equipment Checklist
After unpacking the switch, check the contents to be sure you have received all the
components. Then, before beginning the installation, be sure you have all other
necessary installation equipment.
Package Contents
• GTL-2691
• Four adhesive foot pads
• Bracket Mounting Kit containing two brackets and eight screws for attaching the
brackets to the switch
• Power cord—either US, Continental Europe or UK
• Console cable (RJ-45 to RS-232)
• This Installation Guide
• Management Guide CD
Optional Rack-Mounting Equipment
If you plan to rack-mount the switch, be sure to have the following equipment
available:
• Four mounting screws for each device you plan to install in a rack—these are not
included
• A screwdriver (Phillips or flathead, depending on the type of screws used)
R
J-45
C
onnector
Summary of Contents for GTL-2691
Page 2: ......
Page 4: ......
Page 18: ...xiv Figures...
Page 34: ...2 8 Network Planning 2...
Page 44: ...3 10 Installing the Switch 3...
Page 54: ...4 10 Making Network Connections 4...
Page 58: ...A 4 Troubleshooting A...
Page 64: ...B 6 Cables B...
Page 76: ...Index Index 4...
Page 77: ......
Page 78: ...Level One GTL 2691...