9
UNPACKING AND INSTALLATION
This chapter provides unpacking and installation information for
GSW-2475T.
Unpacking
Open the shipping cartons of GSW-2475T and carefully unpacks its
contents. The carton should contain the following items:
One 24-Port 10/100/1000Mbps Gigabit Ethernet Web Smart
Switch
One AC power cord, suitable for your area’s electrical power
connections
Four rubber feet to be used for shock cushioning
Screws and two mounting brackets
CD-Rom with Web Management Utility and User’s Guide
If any item is found missing or damaged, please contact your local
reseller for replacement.
Installation
The site where you install the hub stack may greatly affect its
performance. When installing, consider the following pointers:
Install GSW-2475T in a fairly cool and dry place. See
Technical
Specifications
for the acceptable temperature and humidity
operating ranges.
Install GSW-2475T in a site free from strong electromagnetic
field generators (such as motors), vibration, dust, and direct
exposure to sunlight.