
C
HAPTER
4
| Making Network Connections
Twisted-Pair Devices
– 47 –
N
ETWORK
W
IRING
C
ONNECTIONS
Today, the punch-down block is an integral part of many of the newer equipment
racks. It is actually part of the patch panel. Instructions for making connections
in the wiring closet with this type of equipment follows.
1.
Attach one end of a patch cable to an available port on the switch, and the
other end to the patch panel.
2.
If not already in place, attach one end of a cable segment to the back of the
patch panel where the punch-down block is located, and the other end to a
modular wall outlet.
3.
Label the cables to simplify future troubleshooting. See
Connection Records” on page 52
.
Figure 16: Network Wiring Connections
Equipment Rack
(side view)
Switch
Patch Panel
Punch-Down Block
Wall
28
27
115200,n,8,1
Summary of Contents for GEL-2870
Page 1: ...LevelOne GEL 2870 24 GE 4 GE Combo SFP L2 SNMP Switch Installation Guide version 1 0...
Page 2: ......
Page 4: ......
Page 14: ...COMPLIANCES AND SAFETY STATEMENTS 14...
Page 20: ...TABLES 20...
Page 22: ...FIGURES 22...
Page 28: ...CHAPTER 1 Introduction Description of Hardware 28...
Page 70: ...GLOSSARY 70...
Page 73: ......