SETUP INSTRUCTIONS

INLET

COLD

HOT

INLET

VALVE

SMALL

THERMOMETER

V2

VALVE

LARGE

V1

6. Set outlet temperature of the large Type TM Valve to the 

required level.

7. Open outlet Valve V1 at the small TM Valve.
8. Shut outlet Valve V2 at the large TM valve.
9. Turn on enough fixtures for a flow of at least 2 GPM 

(7.6 l/min) downstream from this system. Make sure 
each fixture is set to deliver full "HOT" water.

10. Set outlet temperature of the small TM valve to the same 

temperature as the large TM Valve.

11. Open outlet Valve V2. System is operational. To balance 

circulation system temperature, see page 4 & 5. 

1. The High-Low Unit MUST be piped according to a 

Leonard Required Piping Method (see page 4 & 5). 

2. Make sure full hot and cold supplies to this assembly are 

operating. The temperature of the hot water source must 
be properly set and maintained. 

3. The circulator (if used) must be turned OFF before setup. 
4. Turn on enough fixtures for a flow of at least 30 GPM

(114 l/min.) downstream from this system. Make sure 
each fixture is set to deliver full "HOT" water. 

5. Close outlet Valve V1 at the smaller Type TM Valve 
6. Make sure Valve V2 at the large Type TM Valve is in the 

full open position.

•NOTE! FOR OPTIONAL OUTLET SETUP PIPING ARRANGEMENT, SEE PAGE 8

3

Summary of Contents for TM-2020A

Page 1: ...is installed on a recirculated hot water system it MUST be piped according to LEONARD S REQUIRED PIPING METHODS see pages 4 5 6 Refer to page 3 of this bulletin for correct Setup Instructions 1 Type T...

Page 2: ...he top side of the web which is cast on the RIGHT SIDE OF THE COVER 5 Replace stop retaining ring 6 Replace POINTER so that it is pointing to the extreme HOT position The new maximum temperature has n...

Page 3: ...ystem is operational To balance circulation system temperature see page 4 5 1 The High Low Unit MUST be piped according to a Leonard Required Piping Method see page 4 5 2 Make sure full hot and cold s...

Page 4: ...ON PROCEDURE TO BALANCE CIRCULATION SYSTEM 1 MAKE SURE NO WATER IS BEING DRAWN IN THE BUILDING OPEN VALVE 1 APPROXIMATELY HALF WAY AND START CIRCULATOR 2 OBSERVE TEMPERATURE UNTIL IT STABILIZES 3 CLOS...

Page 5: ...EMPERATURE IS SET 4 IF UNABLE TO REACH DESIRED TEMPERATURE OPEN VALVE 2 FULL REPEAT STEPS 2 AND 3 5 THERMOMETER HEAT TRAP SUPPLY COLD SOURCE WATER HOT HIGH TEMPERATURE SUPPLY BY PASS FULL LINE SIZE HI...

Page 6: ...ble must move freely on the port sleeve unscrew the check nut as far as it will go then screw the port sleeve nut into the base The port sleeve and thimble may be lifted out SEE DWG A 5 Clean in a non...

Page 7: ...KITS REMEMBER THIS IS A CONTROL DEVICE WHICH MUST BE CLEANED AND MAINTAINED ON A REGULAR BASIS SEE MAINTENANCE GUIDE AND RECORD NOTE AFTER INSTALLING NEW PARTS IT WILL BE NECESSARY TO RESET THE ADJUS...

Page 8: ...KITS REMEMBER THIS IS A CONTROL DEVICE WHICH MUST BE CLEANED AND MAINTAINED ON A REGULAR BASIS SEE MAINTENANCE GUIDE AND RECORD NOTE AFTER INSTALLING NEW PARTS IT WILL BE NECESSARY TO RESET THE ADJUS...

Page 9: ...ITED WARRANTY Leonard Valve Company warrants the original purchaser that products manufactured by them not by others will be free from defects in materials and workmanship under normal conditions of u...

Reviews: