Leonard MEGATRON 10N Installation Adjustment Service Download Page 7

SMALL TM VALVE PARTS

& PKG. (2 EACH)

KIT R/28 REBUILDING KIT

KIT 4/M20 CHECKSTOP KIT

CONTROL ASSEMBLY

KIT 1/26 PACKINGS & GASKETS

LOWER STEM

O'RING (2 EACH)

HOLDER NUT

LOWER STEM

& PACKING

BONNET PKG.

2 EACH:

M20-6A

M20-3C

GASKET

COVER

(2 EACH)

GLAND PKG.

M20-3A

(2 EACH)

MU-4C

STEM O'RING

MU-5A UPPER

GASKET

M20-3C
COVER

M20-3A

BONNET PKG.

TM-28-1-12B

THERMOSTATIC

(2 EACH)

O'RING

MU-5A

M20-6A

TM-28-6B

CHECK SPRING

CHECK SPRING

M20-9A

M20-9A

(2 EACH)

REMEMBER!

THIS IS A CONTROL DEVICE

WHICH

MUST

BE

CLEANED

AND

MAINTAINED ON A REGULAR BASIS (SEE
MAINTENANCE GUIDE AND RECORD)

NOTE:

AFTER INSTALLING NEW PARTS IT

WILL

BE

NECESSARY

TO

RESET

THE

ADJUSTABLE HIGH TEMPERATURE LIMIT
STOP ON EACH VALVE (SEE PAGE 2).

CHECKSTOP PARTS

REPAIR KITS

MU-4A RF

MU-5A UPPER

CHECKSTOPS

STEM PKG.

M20-3A BONNET

PACKING

AND PACKING

UPPER STEM

CHECK SPRING

M20-6A LOWER

STEM & PACKING

M20-9A

CHECK BONNET

M20-2A RF

MU-10B

G LA ND  NUT

G LAND PACKING

(2 RE Q'D)

TM-28 -1 -8B

B RIDGE A SSEMBLY

(2 RE Q'D)

TGM-1/28

B RIDGE

(2 RE Q'D)

HOL DE R NUT O'RING

TM-28 -6B

TM2 5-5

P .S. PA CKING

(2 RE Q'D)

P ORT SLEEVE

TM25 -3B

ASSEMBLY

P OINTER ROD NUT

M20 -1 C RF/CP

P .S . HO LDER NUT

MU-4C

TM-25 -3A

DIAL PLATE

5 7-D  RF

COVER

TM28 -G2

THERMOS TAT GROUP

(2 RE Q'D)

TM2 5-3

P .S.  HO LDER

M20 -3C

GASKET

COVER

03307

P OINTER

7628

L TR SET SCREW

6910

P OINTER SCREW

7520

7

Summary of Contents for MEGATRON 10N

Page 1: ...stalled on a recirculated hot water system MUST be piped according to LEONARD S REQUIRED PIPING METHOD 5 see page 4 6 Refer to page 3 of this bulletin for correct Setup Instructions Maximum Operating...

Page 2: ...less than shown see Flow Capacities page 12 If installed on a recirculated hot water system make certain the valve is piped according to Leonard s Required Piping Methods see page 4 REMEMBER THIS IS A...

Page 3: ...enough fixtures for a flow of at least 2 GPM 7 6 l min downstream from this system Make sure each fixture is set to deliver full HOT water 12 Close all ball valves except valve A on valve assembly 1...

Page 4: ...EST CONNECTION PROCEDURE TO BALANCE CIRCULATION SYSTEM 1 MAKE SURE NO WATER IS BEING DRAWN IN THE BUILDING OPEN BALANCING VALVE 1 APPROXIMATELY HALF WAY AND START CIRCULATOR KEEP BALANCE VALVE 2 CLOSE...

Page 5: ...on corrosive cleaning solution DO NOT USE ABRASIVES Be certain thimble moves freely on port sleeve Note Driving ball on thimble must engage coil bracket in assembling 6 To disassemble bridge assembly...

Page 6: ...OINTER ROD KIT 2 200Y CHECKSTOP KIT KIT 1 200Y PACKINGS GASKETS THERMOSTAT TGM 2 125 GROUP SCREEN 4724 TM 8 STEM O RING 4 LOWER STEM PACKING COIL SLEEVE 4733 2 EA STUD SPRING YELLOW 4742 TGM 1 200 POR...

Page 7: ...NANCE GUIDE AND RECORD NOTE AFTER INSTALLING NEW PARTS IT WILL BE NECESSARY TO RESET THE ADJUSTABLE HIGH TEMPERATURE LIMIT STOP ON EACH VALVE SEE PAGE 2 CHECKSTOP PARTS REPAIR KITS MU 4A RF MU 5A UPPE...

Page 8: ...essure required to operate the farthest fixture i e Shower valves in the building WIRING DIAGRAM RED LIGHT 110 VAC GFI PLUG AND SWITCH GREEN LIGHT CIRCULATOR AQUASTAT GFI RECEPTACLE AND SWITCH TRIPLE...

Reviews: