
Commissioning
Initial switch−on
EDK82ZAFVC001 DE/EN/FR 2.0
53
l
H1inbet−reihenfolge einhalten
Initial switch−on
)
Note!
The commissioning of function modules with DeviceNet communication
profile cannot be described without going into the program required for the
network operation.
Such a program is not included in the Lenze delivery scope.
Due to the large number of programs available in the market, it is not possible
to give a
universal
description for the commissioning of the function module.
Step−by−step commissioning
)
Note!
Keep to the switch−on sequence!
Summary of Contents for E82ZAFVC001
Page 3: ...E82ZAFV001E ...