Place the two stabilizing bars on the ground, and remove the bars.
Step 3. Remove the four screws that secure each of the outriggers, and remove the outriggers.
Figure 151. Removing the outriggers
Install the outriggers
Watch the procedure.
A video of this procedure is available from the following links:
• YouTube:
https://www.youtube.com/playlist?list=PLYV5R7hVcs-DOG7dnH9Zxy67Q3dez4ZsM
• Youku:
https://list.youku.com/albumlist/show/id_59715555
Procedure
Step 1. Extend each of the four leveling pads in turns until they firmly contact the floor and support the rack
cabinet. Make sure the cabinet is balanced by gently pushing the cabinet. If it tilts, adjust the length
of the leveling pads until the cabinet is well balanced.
.
Hardware removal, installation and reversion
135
Summary of Contents for ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet
Page 1: ...ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide Machine Type 7D6D ...
Page 4: ...ii ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide ...
Page 16: ...12 ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide ...
Page 23: ...Figure 19 Rising the leveling pads Chapter 3 Rack cabinet setup 19 ...
Page 146: ...142 ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide ...
Page 152: ...148 ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide ...
Page 153: ......
Page 154: ......