34
Lenovo IdeaPad U300e Hardware Maintenance Manual
Note: Applying labels to the base cover
The new base cover FRU is shipped with a kit containing labels of several
kinds. When you replace the base cover, you need to apply the following
label:
The following labels need to be peeled off from the old base cover, and need
to be put on the new base cover.
a
COA Label
b
Brazil label
c
WLAN label for Malaysia
d
WLAN label for Indonesia
e
GWE for china
For some models, you also need to apply one or two FCC labels. Check the
old base cover; if it has one or two FCC labels, find duplicates of them in the
label kit and apply them to the new base cover.
For the location of each label, refer to the following figure:
a
b
c
d
e