Figure 114. Installing the supporting bracket
Tighten the three screws in the middle to secure the supporting bracket from the air baffle.
Tighten the one captive screw and two thumbscrews to secure the bracket to the chassis.
After this task is completed
Proceed to complete the parts replacement (see
“Complete the parts replacement” on page 174
).
Power backplane replacement
See these topics to learn how to remove and install the power backplane.
Remove the power backplane
See this topic to learn how to remove the power backplane.
About this task
Attention:
• Go over
“Installation Guidelines” on page 41
to ensure that you work with safety.
• Turn off the server and peripheral devices and disconnect the power cords and all external cables (see
“Power off the server” on page 13
).
• If the server is installed in a rack, slide the server out on its rack slide rails to gain access to the top cover,
or remove the server from the rack.
Watch the procedure.
A video of this procedure is available from the following link:
•
https://www.youtube.com/playlist?list=PLYV5R7hVcs-DV_Ja2E7l6T-lwN_IrnJRk
120
ThinkEdge SE450 Maintenance Manual
Summary of Contents for 7D8T
Page 1: ...ThinkEdge SE450 Maintenance Manual Machine Types 7D8T ...
Page 8: ...vi ThinkEdge SE450 Maintenance Manual ...
Page 22: ...14 ThinkEdge SE450 Maintenance Manual ...
Page 45: ...Server components Figure 17 Server components Chapter 2 Server components 37 ...
Page 184: ...176 ThinkEdge SE450 Maintenance Manual ...
Page 206: ...198 ThinkEdge SE450 Maintenance Manual ...
Page 210: ...202 ThinkEdge SE450 Maintenance Manual ...
Page 217: ......
Page 218: ......