Figure 128. Top cover locking/unlocking direction
1
Unlocking direction
2
Locking direction
After this task is completed
Proceed to complete the parts replacement (see “Complete the parts replacement” on page 218).
Complete the parts replacement
Go through this checklist before completing parts replacement.
To complete parts replacement, go through the following list:
1. Ensure that all the removed components have been properly reinstalled and that no tools or loose
screws are left inside your server.
2. Properly route and secure the cables in the server. Refer to the cable connecting and routing information
for each component.
3. Make sure to install one of the following:
• With two installed processors: system air baffle.
• With four installed processors:
– Processor and memory expansion tray
–
Expansion tray air baffle
and
upper expansion tray air baffle
218
ThinkSystem SR850 V2 Maintenance Manual
Summary of Contents for 7D31
Page 1: ...ThinkSystem SR850 V2 Maintenance Manual Machine Types 7D31 and 7D32 ...
Page 8: ...vi ThinkSystem SR850 V2 Maintenance Manual ...
Page 52: ...44 ThinkSystem SR850 V2 Maintenance Manual ...
Page 60: ... Three backplanes on page 57 52 ThinkSystem SR850 V2 Maintenance Manual ...
Page 70: ...62 ThinkSystem SR850 V2 Maintenance Manual ...
Page 71: ...Chapter 3 Internal cable routing 63 ...
Page 78: ...70 ThinkSystem SR850 V2 Maintenance Manual ...
Page 114: ...106 ThinkSystem SR850 V2 Maintenance Manual ...
Page 236: ...Figure 133 System board and expansion board LEDs 228 ThinkSystem SR850 V2 Maintenance Manual ...
Page 258: ...250 ThinkSystem SR850 V2 Maintenance Manual ...
Page 260: ...252 ThinkSystem SR850 V2 Maintenance Manual ...
Page 264: ...256 ThinkSystem SR850 V2 Maintenance Manual ...
Page 273: ......
Page 274: ......