
40
IdeaPad Tablet K1 Hardware Maintenance Manual
Figure 6. Removal steps of Switch board, SD board and HDMI board (continued)
Remove two screws
7
, then remove the docking board in the direction shown
by arrow
8
.
7
8
7
Step
Screw (quantity)
Color
Torque
7
M4.5 x 3 mm, flat-head, nylon-coated (2)
Silver
1.5-2.0 kg/cm