
28K/30K/40K
Gas side piping
Liquid side piping
Torque wrench
Outdoor unit
1
2
4
3
5
6
CLAMP
(Ø10.7)
TO INDOOR UNIT CONNECTOR
POWER SUPPLY
–22–
1) Connecting pipings to outdoor unit
Align the center of the pipings and sufficiently
tighten the flare nut with fingers.
Finally tighten the flare nut with torque wrench
until the wrench clicks.
• When tightening the flare nut with torque wrench,
ensure the direction for tightening follows the
arrow on the wrench.
2) Connecting cable to outdoor unit
Open the control board cover from the outdoor unit
by removing the screws.
Connect wires to the terminals on the control
board individually and secure the cables onto the
control board with clamp.
■
Connecting Piping and the Cable to Outdoor Unit
PIPE SIZE
TORQUE
3/8"
4.2 Kg.m
1/2"
5.5 Kg.m
5/8"
5.5 Kg.m
3/4"
6.5 Kg.m
Perform grounding
• This product should be grounded.
• Defective grounding could cause an electric shock.
CAUTION
Summary of Contents for VHA 30
Page 1: ...INSTALLATION OPERATING MAINTENANCEMANUAL FLOOR STANDING SPLIT UNIT English July 2002...
Page 2: ......
Page 37: ...Schematic Diagram 36...
Page 39: ...38 149750 135515 336610 359011 346810 249951 268714 354211 130411 330870 W0CZZ 352150 330860...
Page 43: ...42 Memo...
Page 44: ......
Page 45: ......