Multi Variable Air Conditioners Duct Type Indoor Unit
11
NOTES!
The length of bolt depends on the installation height of the unit, bolts are field supplied.
5.1.3 Lift the Unit
Lift up the unit to the ceiling and secure it on the bolt. Use specialized nut to secure the unit.
Fig 5.1.4
NOTES
!
①
Before installation, please finish the preparation work of all pipes (connection pipe, drain
pipe) and wires (wired controller wire, connection wire of IDU and ODU) that need to be
connected with the indoor unit.
②
Punch holes on the ceiling (air return opening or air inlet). Ceiling may have to be
strengthened to make it level and to prevent it from vibration. You may consult user or
constructor for details.
③
If the ceiling is not strong enough, you can install a beam bracket in a corner and secure the
unit on the beam.