Page 1
07/11
*2P0711*
506723−01
*P506723-01*
E
2011 Lennox Industries Inc.
Dallas, Texas, USA
AIR FLOW
UPFLOW
AIR FLOW
AIR FLOW
HORIZONTAL RIGHT
HORIZONTAL LEFT
INSTALLATION
INSTRUCTIONS
ML195UH
MERIT
®
SERIES GAS FURNACE
UPFLOW / HORIZONTAL AIR DISCHARGE
506723−01
07/2011
Supersedes 506533−01
THIS MANUAL MUST BE LEFT WITH THE
HOMEOWNER FOR FUTURE REFERENCE
This is a safety alert symbol and should never be ignored.
When you see this symbol on labels or in manuals, be alert
to the potential for personal injury or death.
CAUTION
As with any mechanical equipment, personal injury
can result from contact with sharp sheet metal
edges. Be careful when you handle this equipment.
WARNING
Improper installation, adjustment, alteration, service
or maintenance can cause property damage, person-
al injury or loss of life. Installation and service must
be performed by a licensed professional installer (or
equivalent), service agency or the gas supplier.
Table of Contents
Unit Dimensions
2
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
ML195UH Parts Arrangement
3
. . . . . . . . . . . . . . . . . . . . .
ML195UH Gas Furnace
4
. . . . . . . . . . . . . . . . . . . . . . . . . .
Shipping and Packing List
4
. . . . . . . . . . . . . . . . . . . . . . . .
Safety Information
4
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Use of Furnace as a Construction Heater
5
. . . . . . . . . . .
General
6
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Combustion, Dilution, Ventilation Air
6
. . . . . . . . . . . . . . .
Setting Equipment
9
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Filters
13
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Duct System
13
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Pipe and Fittings Specifications
13
. . . . . . . . . . . . . . . . . . .
Joint Cementing Procedure
15
. . . . . . . . . . . . . . . . . . . . . . .
Venting Practices
16
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Vent Piping Guidelines
17
. . . . . . . . . . . . . . . . . . . . . . . . . . .
Gas Piping
34
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Electrical
37
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Unit Start Up
40
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Gas Pressure Measurement
42
. . . . . . . . . . . . . . . . . . . . . .
Proper Combustion
42
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
High Altitude
42
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Other Unit Adjustments
44
. . . . . . . . . . . . . . . . . . . . . . . . . .
Blower Motor Performance
45
. . . . . . . . . . . . . . . . . . . . . . .
Service
47
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Planned Service
49
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Integrated Control Diagnostic Codes
49
. . . . . . . . . . . . . . .
Troubleshooting
50
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Repair Parts List
53
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Start Up Checklist
54
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Litho U.S.A.