
22
Trap
Drain pipe
Clearance around the unit for service and maintenance.
2.- INSTALLATION
2.6.- DRAINS
For the unit with
optional FREECOOLING
, it should be kept in mind that the bedplate anchors
cannot be used to
hang
the unit.
Consult other options for outdoor mounting or changes in position of the air return duct if the unit
is to be hung.
All indoor sections of these units ( and the outdoor sections for the Heat Pump) have a ¾ steel threaded drain
pipe welded to the condensation tray.
One PVC drain trap is supplied with the Cooling-only units, and two with the heat pump units.
Connect the trap/s to the drain pipe/s on the unit and mount the drain pipe with at least a 2% incline from the trap.
Also slightly tip the unit (2%) toward the drainage side. Check that the condensation trays are clean and free from
dirt and other debris from the works and that water drains correctly.
2.5.- INSTALLATION CLEARANCES
1 m
1 m
1 m
1 m
2%
2%