
6
IOM / @DNOVA_THS-0508
2.
INSPECTION/TRANSPORT
a. Inspection on receipt
On receiving the unit, check that it is perfectly intact: the unit left the factory in perfect conditions;
immediately report any signs of damage to the carrier and note them on the Delivery Slip before signing
it. LENNOX or its Agent must be promptly notified of the entity of the damage. The Customer must
submit a written report describing every significant sign of damage.
b. Lifting and transport
While the unit is being unloaded and positioned, utmost care must be taken to avoid abrupt or violent
manoeuvres. The unit must be handled carefully and gently; avoid using machine components as
anchorages or holds and always keep it in an upright position. The unit should be lifted using the pallet it
is packed on; a transpallet or similar conveyance means should be used.
Warning: In all lifting operations make sure that the unit is securely anchored in order to
prevent accidental falls or overturning.
c. Unpacking
The packing must be carefully removed to avoid the risk of damaging the unit. Different packing materials
are used: wood, cardboard, nylon etc. It is recommended to keep them separately and deliver them to
suitable waste disposal or recycling facilities in order to minimise their environmental impact.