Installation manual
– English
Preparation of components:
Sort the components based on
the wall plans (see Technical
specifications) and place them
at the four sides of the house in
the installation sequence.
ATTENTION:
Never place the
components directly on grass or
a muddy surface because it will
be
very
difficult
or
even
impossible to clean them up
later!
Foundation
A good foundation is the most important aspect guaranteeing the duration and safety of your house.
Only a completely level, rectangular and bearing foundation will ensure problem-free installation of the
house, its stability and especially the matching of the doors. With a good foundation, your house will
stand for many years more.
Prepare the foundation so that its upper edge extends from the ground to a height of at least 5 cm. At
the same time make sure that there are sufficient air apertures under the house floor for ventilation.
We recommend the following foundation options:
•
Strip or spot foundation
•
Foundation from concrete or pavement slabs
•
Cast concrete bed
Prepare the foundation so that the foundation joists are propped up on every side with intervals not
exceeding 50-60 cm.
Consult an expert in this field or have the foundation prepared by specialists.
3 Garden house assembly
ATTENTION
:
➢
The house package also includes 2-3 marked hitting blocks (wall profile approximately 20-30 cm
long).
All of the details listed above ARE NOT mentioned in the specification list.
➢
The drawings have the details marked with three-digit position numbers. The exact positions of
those details that have the third digit “x” can be found in the specification list.
Summary of Contents for Palmako 109503
Page 5: ......
Page 6: ......
Page 7: ......
Page 8: ......
Page 9: ......
Page 10: ......
Page 11: ......
Page 12: ......
Page 13: ......
Page 14: ......
Page 15: ......
Page 16: ......
Page 18: ...C ca 25 ca 1 RB2 1 RE2 x RB2 x SP2 4 5x50 RE2 2 RE2 3 RE2 1 ...
Page 19: ...Raix Raix Raix Raix Raix Raix Raix Raix Raix CoBx CoBx CoBx CoBx CoBx CoBx ...
Page 20: ...RE2 x RB2 x SP2 Raix Raix Raix Raix Raix Raix 4 5x50 E ...
Page 21: ...19x114 19x114 RE2 x RB2 x SP1 underlayer is recommended SBS SBS SBS SBS ...
Page 22: ...SBS CoB CoB 4 5x50 SBS SBS ...