5.4006.8501.0
B
6-17
Close-up
1.
Use a suitable lifting or tilting tool to put the machine back onto its wheels.
2.
Switch On the Machine (see page 5-3).
3.
Start the Lely Control Application (see page 5-4).
4.
Push
.
During the calibration process you must not move the machine.
5.
Push
Yes
to start the gyroscope calibration process.
6.
Wait until a beep is heard (about 5 minutes) to confirm that the calibration is complete.
7.
Drive the Machine to the Charging Station (see page 5-6).
8.
Start the time path to put the machine into operation (see Start or Stop the Time Path on page 5-32).
6.3.10
Replace the Sliding Disc
Preparation
1.
Manually drive the machine to a clean and quiet location (see Manually drive the Machine on page 5-
6).
2.
Switch Off the Machine (see page 5-3).
Replace
Unexpected cow movement.
Risk of being crushed or trampled.
Block the cow traffic.
Heavy parts.
Risk of personal injury.
Use suitable lifting or tilting equipment.
1.
Use a suitable lifting or tilting tool to lift the front of the machine and put the vehicle on its rear.
in n o vato rs in ag ric u ltu re
Summary of Contents for Lely Discovery 90 SW
Page 2: ...INTENTIONALLY BLANK 5 4006 8501 0 B innovators in agriculture ...
Page 6: ...INTENTIONALLY BLANK 5 4006 8501 0 B 6 List of Included Amendments innovators in agriculture ...
Page 16: ...INTENTIONALLY BLANK 5 4006 8501 0 B 1 2 Lely Discovery innovators in agriculture ...
Page 62: ...INTENTIONALLY BLANK 5 4006 8501 0 B 4 36 Description and Operation innovators in agriculture ...
Page 98: ...INTENTIONALLY BLANK 5 4006 8501 0 B 5 36 Operating Instructions innovators in agriculture ...
Page 124: ...INTENTIONALLY BLANK 5 4006 8501 0 B 7 8 Test and Adjustment innovators in agriculture ...
Page 146: ...INTENTIONALLY BLANK 5 4006 8501 0 B 9 2 Disposal innovators in agriculture ...
Page 149: ......