![LELY DISCOVERY 90 S Operator'S Manual Download Page 107](http://html1.mh-extra.com/html/lely/discovery-90-s/discovery-90-s_operators-manual_1874482107.webp)
5.4002.8501.0
B
7-3
The standard value is 200 mSec.
5.
Push
to confirm and go one level up.
7.3
Tests
7.3.1
Analyse the Reliability of a Route
1.
Start the Lely Control Application (see page 5-5).
2.
Stop the time path to take the machine out of operation (see Start or Stop the Time Path on page 5-
33).
3.
In the main menu of the Lely Control app, select
Routes
and push
.
To Analyse the Reliability per Route
1.
Select
Route analysis
and push
.
2.
Select
Fail. problty
and push
.
Push
or
to display routes that are not displayed.
3.
If a route has a failure probability of more than 2 (see Failure Probability per Route on page 4-19):
1.
Make a note of the route number.
4.
Push
to confirm and go one level up.
Because a route can not be modified, you have to delete an unreliable route and to make
a new one. Before doing so it is good to figure out what is wrong.
To Analyse the Cause of an Unreliable Route
1.
Select
Failure analys
and push
.
in n o vato rs in ag ric u ltu re
Summary of Contents for DISCOVERY 90 S
Page 2: ...INTENTIONALLY BLANK 5 4002 8501 0 B innovators in agriculture...
Page 6: ...INTENTIONALLY BLANK 5 4002 8501 0 B 6 List of Included Amendments innovators in agriculture...
Page 16: ...INTENTIONALLY BLANK 5 4002 8501 0 B 1 2 Lely Discovery innovators in agriculture...
Page 56: ...INTENTIONALLY BLANK 5 4002 8501 0 B 4 32 Description and Operation innovators in agriculture...
Page 104: ...INTENTIONALLY BLANK 5 4002 8501 0 B 6 12 Maintenance innovators in agriculture...
Page 112: ...INTENTIONALLY BLANK 5 4002 8501 0 B 7 8 Test and Adjustment innovators in agriculture...
Page 134: ...INTENTIONALLY BLANK 5 4002 8501 0 B 9 2 Disposal innovators in agriculture...
Page 137: ......