![Lekkie Converted System Summit Installation Instructions Manual Download Page 6](http://html.mh-extra.com/html/lekkie/converted-system-summit/converted-system-summit_installation-instructions-manual_1874302006.webp)
2.1 Tools required
Prep Tools-
•
Allen Key set
•
Bottom Bracket tool + socket wrench
•
Screwdrivers (Philips, possibly Flat Head)
•
Sidecutters
•
Crank puller/extractor tool
• Adjustable spanner / ring spanners / socket set
•
Chain breaker
Installation Tools-
as above +
•
Converted System lockring socket or external bottom bracket tool + 1/2” socket wrench (ideally a
torque wrench)
•
C-spanner or Converted System lock cup socket. 44mm 16 notch.
• Half-round file (potentially, depending on frame)
Consumables/extras- items you may consider
•
Extra cable/zip ties - some bikes need more than others
• Shift cable(core) - it can sometimes be difficult to a install shift sensor with an old cable
(especially with frayed end) as you need to slide it onto the cable.
• New chain - We advise fiting a new chain. remember you have just added more power to your
ride. A tired old chain may not like it,
•
Cable extensions - We’ve tuned the cable lengths to cover most bikes, but if you’ve got a special
build or cargo bike you might need some extensions.
2. TOOLS