RABBETED HALF-BLIND DOVETAILS
46
Chapter 11
S
uper
J
ig
-12-18-24 User Guide
11-5
Stick the block
to the jig face with double-sided tape,
making sure it touches the side stop.
�
11-6
The drawer side will now be stepped in from the side stop
by the width of the rabbet, bringing the sockets in line with
the pins.
11-7
Make sure you select a dovetail bit that has a working depth
of cut less than the rabbet height. Otherwise, you will rout into the
rabbet.
11-8
It is difficult to clean up the drawer sides and front corner
after assembling a rabbeted drawer, so make sure the fit is flush
before you complete the drawers See 9-28 to 9-30.
■
Summary of Contents for Super12
Page 12: ...JIG ASSEMBLY MOUNTING AND USING THE CLAMPS 6 Chapter 1 SuperJig 12 18 24 User Guide ...
Page 22: ...WOOD PREPARATION 16 Chapter 6 SuperJig 12 18 24 User Guide ...
Page 50: ...SINGLE PASS HALF BLIND DOVETAILS 44 Chapter 10 SuperJig 12 18 24 User Guide ...
Page 56: ...ASYMMETRIC DOVETAILS 50 Chapter 12 SuperJig 12 18 24 User Guide ...
Page 72: ...HINTS AND TIPS 66 Chapter 15 SuperJig 12 18 24 User Guide ...
Page 84: ...JIG PARTS LIST 78 Appendix III SuperJig 12 18 24 User Guide ...
Page 86: ...Printed in Canada Joining Tradition with Today Leigh Router Joinery Jigs ...