background image

7.  Place each end of one chain (J) through each hole 

on the right arm (C) and attach the end links to the 

eye bolts (F). Repeat for the other side, then securely 

tighten the nuts (G) with the wrench (EE).

Hardware Used

EE

Wrench

x 1

7

 

C AA

C

F

GG

J

GG

J

GG

G

8.  Locate a ceiling beam that is sturdy enough to 

handle the load of the swing and the occupants 

(approximately 500 lbs.). Drill 2 vertical 5/32-inch pilot 

holes in the center of the ceiling beam, 50 inches 

apart. Insert the set bolts (I) and screw them into the 

holes until no threads are exposed. 

Note:

 Ensure the alignment of the set bolts (I) are 

conducive to the intended swinging motion of the 

item. 

CAUTION:

 Incorrect installation of the ceiling hooks 

can cause the swing to fall and possibly cause 

serious injury to occupants. Be sure to drill the 

correct size holes into a sturdy wood beam.

Incorrect

Exposed 

threads

Correct

No exposed 

threads

GG

I

GG

I

9.  Hang the chains (J) on the set bolts (I).

9

 

GG

I

GG

J

Reviews: