Lehigh JHD Installation & Operating Instructions Manual Download Page 3

- 1 -

A. 

INSTALLATION:

  

(Follow All Safety Lockout/Tagout Procedures)

The cylinder is shipped from the factory with the MIRACALUBE self-lubrication
system (filled at the factory at the time of assembly). It is not necessary to add
grease or other lubrication to the unit prior to installation.

The cylinder is shipped with protective caps in the ports. Do not remove these
caps until the piping is ready for installation. If the cylinder has been in storage
for an extended time, it is advisable to exercise the cylinder; i.e., flex the internal
seals by stroking the piston before installation. Insure the air line used is equipped
with suitable filters, pressure control and a water trap.

Alignment of the piston rod with the work is necessary for the cylinder to operate
satisfactorily and insure long seal and rod bearing life. Be sure all mounting
surfaces are clean, smooth, flat and in alignment. Before finish piping of the
cylinder, stroke the cylinder using the air line to check the mounting arrangement
for misalignment or binding of attached mechanisms. The piston rod should
extend and retract without any unsteady or jerky motion.

If the cylinder is equipped with cushions, adjust the cushion screws to produce the
desired effect for the load, speed and air line pressure to which the cylinders will
be subjected under normal operating conditions.

B.

TROUBLE SHOOTING:

1.

 

JERKY ACTION:

Check for misalignment. Look for a bent or scored piston rod. The rod
bushing may be damaged. Check the cylinder tube for dents or bumps.
Confirm that the air cylinder supply pressure and volume are adequate to
operate the cylinder under normal conditions.

2.

 

AIR LEAKAGE:

a.

 

 Loss of Power or No Power:

1.

 

Check the air pressure at the machine. Then check the operating
pressure at the control valve for the cylinder and check the line
pressure at the cylinder port(s).

2.

 

Apply air pressure to one port of the cylinder and check for
escaping air from the opposite port or the exhaust port of the control
valve.

SHOP ONLINE at www.airlinehyd.com

800-999-7378

Summary of Contents for JHD

Page 1: ...UCTIONS REMEMBER WHEN PERFORMANCE COUNTS SPECIFY LEHIGH LEHIGH FLUID POWER INC 1413 ROUTE 179 LAMBERTVILLE NJ 08530 www lehighfluidpower com 609 397 3487 FAX 609 397 0932 ISSUE DATE 1993 800 257 9515 REVISED 7 05 SHOP ONLINE at www airlinehyd com 800 999 7378 ...

Page 2: ...age 1 2 a Loss of Power or No Power 1 2 b Evident Leak at Rod Seal 2 c Leak between the Cylinder Tube and End Caps Heads 2 2 Loud Metallic Impact Noise 2 C General Rebuild Instructions 3 4 1 General Guidelines 3 2 Piston Rod Assembly w Miracalube Lubrication System 3 3 Final Assembly 4 D ED Lock Screw Cylinder Option 4 E Caution Section 5 List of Typical Repair Kit Contents 6 Component Torque Char...

Page 3: ...he cylinder stroke the cylinder using the air line to check the mounting arrangement for misalignment or binding of attached mechanisms The piston rod should extend and retract without any unsteady or jerky motion If the cylinder is equipped with cushions adjust the cushion screws to produce the desired effect for the load speed and air line pressure to which the cylinders will be subjected under ...

Page 4: ...s are properly squared to each other Check for the cylinder tube being seated in the tube groove in the face of each head Figure 3 3 LOUD METALLIC IMPACT NOISE Reference Figure 3 Check the cushion adjustment To increase the cushioning effect turn the cushion screw clockwise facing the screw driver slot in the cushion screw If adjusting the cushion screw does not correct the problem replacement of ...

Page 5: ...d with kit Carefully remove the old piston seals so as not to scratch nick or burr the lip or groove of the piston and gently stretch the new piston seals into the piston grooves Be sure that the flat sides of the seals are positioned towards the center of the piston Figure 1 Place the piston and rod assembly in a horizontal position Remove the Wicking Braided Material and either remove with a sha...

Page 6: ...y positioned relative to the port in the Open Head Figure 3 Check the position of the port in the Closed Head relative to the port position in the Open Head Insert the tie rods and just snug the tie rod nuts Lay the cylinder down on a smooth flat surface with the mounting points of the cylinder supported and square the Open Head to the Closed Head Re snug the tie rods as necessary Turn the bearing...

Page 7: ...ABLE THREAD LOCKER 242 BLUE per package directions Remember to install the Cushion Boss O Ring and Cushion Boss as applicable and the Piston Rod O Ring prior to applying the LOCTITE products Do not allow the LOCTITE products to come in contact with the O Ring s The piston nut is torqued per the following table and the threads staked ANY DEVIATION FROM THE LOCTITE PRODUCT INSTRUCTIONS ASSEMBLY PROC...

Page 8: ...equired 1 set Cushion Boss and Piston O Rings use as required 2 Tube O Rings Supplied in Kits 10 00 Bore Up COMPONENT TORQUE CHART Bore Piston Rod Tie Rod Piston Nut Size Diameter Torque Piston Torque 1 1 2 5 8 1 7 Foot Pounds 30 Foot Pounds 2 5 8 1 12 Foot Pounds 30 Foot Pounds 2 1 2 5 8 1 12 Foot Pounds 30 Foot Pounds 3 1 4 1 1 3 8 28 Foot Pounds 140 Foot Pounds 4 1 1 3 8 28 Foot Pounds 140 Foot...

Page 9: ...SHOP ONLINE at www airlinehyd com 800 999 7378 ...

Page 10: ...SHOP ONLINE at www airlinehyd com 800 999 7378 ...

Page 11: ...SHOP ONLINE at www airlinehyd com 800 999 7378 ...

Page 12: ...H FLUID POWER INC 1413 ROUTE 179 LAMBERTVILLE NJ 08530 609 397 3487 FAX 609 397 0932 www lehighfluidpower com For Toll Free Technical Support Call 800 257 9515 SHOP ONLINE at www airlinehyd com 800 999 7378 ...

Reviews: