LEGRAND CHIEF FCS1U Installation Instructions Manual Download Page 6

 FCS1U

Installation Instructions

6

Assembly And Installation

Installing Support Cables

WARNING:  

Failure to provide adequate structural strength 

for this component can result in serious personal injury or 
damage to equipment!  It is the installer’s responsibility to 
make sure the structure to which this component is attached 
can support five times the combined weight of all equipment.  
Reinforce the structure as required before installing the 
component.

IMPORTANT ! : 

If installing with lateral shift accessory 

(PACFCL), refer to the PACFCL installation instructions 
to install accessory to ceiling and floor.

Solid Concrete Ceiling Structure

WARNING:  

Anchors must be installed into structurally 

sound solid concrete with a minimum thickness of 4" 
(101.6mm) or greater.  Installation into hollow concrete block, 
mortar, or concrete that exhibits cracking, spalling, or other 
defects may result in failure of anchor and serious personal 
injury or damage to equipment!

1.

Drill 1/4" diameter x 1-1/2" deep hole at each marked cable 

anchor support location (See Figure 1).  Ensure hole is at 

least 2-1/2" from nearest concrete edge.  Remove debris 

from hole.

Figure 1

2.

Tap anchor (F) into each hole until the anchor head is 

seated in the hole. (See Figure 1)

WARNING:  

Failure to properly set anchor may result in 

failure of anchor and serious personal injury or damage to 
equipment!

3.

Using claw portion of hammer, set each anchor (F) by 

pulling it out of hole approximately 1/4" (6.4mm).  (See 

Figure 1)

4.

Hang turnbuckle (G) or connecting link (C) through the hole 

on each concrete anchor (F). (See Figure 1)

NOTE:  

For larger displays where the turnbuckles may be 

hidden behind the displays, it may be acceptable to 
install the turnbuckles behind the display instead of up 
at the ceiling. Otherwise, installing the turnbuckles at 
the ceiling is recommended for safety reasons. 

5.

Insert portion of manufactured 

loop

 on cable (J) through 

hole in turnbuckle (G) or connecting link (C).  Insert end of 

cable (J) through loop. (See Figure 1)

Wood Ceiling Structure

WARNING:  

Anchors must be installed into wood that 

measures at least 3-1/2" x 1-1/2" (88.9mm x 38.1mm), and 
the anchor must install in the center of the narrower (1-1/2" 
[38.1mm]) face. 

1.

Drill 5/32" diameter x 2" deep hole at each marked cable 

anchor support location (See Figure 2).  Remove debris 

from hole.

Figure 2

2.

Fully thread eye lag (E) into each hole (See Figure 2).

3.

Hang turnbuckle (G) or connecting link (C) through the hole 

on each eye lag (F). (See Figure 2)

NOTE:  

For larger displays where the turnbuckles may be 

hidden behind the displays, it may be acceptable to 
install the turnbuckles behind the display instead of up 
at the ceiling. Otherwise, installing the turnbuckles at 
the ceiling is recommended for safety reasons. 

4.

Route end of cable (J) through turnbuckle (G) or connecting 

link (C) hole and then through cable loop. (See Figure 2)

 

1

2

3

5

1/4"

(J)

(F)

4

(G) or 

4

(C)

5

(J)

1

5/32"

2

4

(E)

(J)

3

(G) or 

3

(C)

4

(J)

Summary of Contents for CHIEF FCS1U

Page 1: ...stru es de Instala o Istruzioni di installazione Installatie instructies Instructions d installation Floor to Ceiling Cable Mount Spanish Product Description German Product Description Portuguese Prod...

Page 2: ...ions IMPORTANT SAFETY INSTRUCTIONS WARNING Failure to read thoroughly understand and follow all instructions can result in serious personal injury damage to equipment or voiding of factory warranty It...

Page 3: ...ANDLE A 59 69 2 35 33 65 1 32 457 20 18 00 25 40 1 00 PLUMB ADJUSTMENT DETAIL A SCALE 1 4 ATTACHMENT POINTS FOR PACFCB SECOND DISPLAY ACCESSORY FOR USE WITH PSBUB INCLUDED SEE INSTALLATION MANUAL AND...

Page 4: ...e lag M 1 Display interface hardware H 10 Cable tie D 4 Cable lock G 2 A 2 Outer frame B 1 Main assembly C 6 Connecting link 1 4 20 Turnbuckle L 1 5 32 F 4 Concrete anchor J 4 25 cable with loop K 4 1...

Page 5: ...MP 1 1 8 Hardware Kit Bag A Bag B Bag C Bag D Bag E Bag F Bag G Bag H Bag I Bag J Bag K Bag L Bag M MB 4 M4 x 20mm 10 24 x 1 2 M4 x 25mm M5 x 12mm M5 x 20mm M5 x 25mm M6 x 12mm M6 x 20mm M6 x 25mm M8...

Page 6: ...equipment 3 Using claw portion of hammer set each anchor F by pulling it out of hole approximately 1 4 6 4mm See Figure 1 4 Hang turnbuckle G or connecting link C through the hole on each concrete an...

Page 7: ...l injury or damage to equipment 3 Using claw portion of hammer set each anchor F by pulling it out of hole approximately 1 4 6 4mm See Figure 3 4 Insert portion of manufactured loop on cable J through...

Page 8: ...s are in open position WARNING IMPROPER INSTALLATION CAN LEAD TO MOUNT FALLING CAUSING SERIOUS PERSONAL INJURY OR DAMAGE TO EQUIPMENT DO NOT substitute hardware Only use hardware provided or specified...

Page 9: ...parately or put two together in different configurations to create different size spacers See Figure 9 Figure 9 9 If the display has a recessed mounting surface protrusions or a power box a spacer and...

Page 10: ...mounting tabs of left and right vertical mounting brackets QR See Figure 11 and See Figure 12 15 Use 1 8 hex key QP to secure upper horizontal mounting bracket QQ to left and right vertical mounting b...

Page 11: ...Figure 13 Figure 13 20 Tighten two turnbuckles until cables are tight and mount is level Adjustments Plumb Adjustment 1 Loosen lower screws holding brackets together See Figure 14 2 Adjust plumb up t...

Page 12: ...225 6000 F 877 894 6918 952 894 6918 Europe A Franklinstraat 14 6003 DK Weert Netherlands P 31 0 495 580 852 F 31 0 495 580 845 Asia Pacific A Office No 918 on 9 F Shatin Galleria 18 24 Shan Mei Stre...