Janu
ary 201
9
Legrand PDU User Guide 117
Power-Off Period Options for Individual Outlets
There are two options for setting the power-off period during the power cycle on each individual outlet's page.
See
Individual Outlet Pages
(on page 114).
Option
Function
PDU defined
(xxx)
Follows the global power-off period setting, which is
set on
PDU
(on page 102). The value xxx in
parentheses is the current global value.
Customized
time
If selecting this option, do either of the following:
Click
to select an existing time option.
Type a new value
with an appropriate time unit
added
. See
Time Units
(on page 105).
Outlet Groups
This outlet-related section applies to Legrand Switched PDUs only.
Choose Outlet Groups in the
Menu
(on page 92). The following Outlet Groups page opens.
Required permissions:
You must have one of the permissions below to be able to operate all or some of the outlet group features.
Administrator Privileges
-- all operations
Change Pdu, Inlet, Outlet & Overcurrent Protector Configuration
-- creating, editing and deleting outlet
groups
Switch Outlet Group
-- powering on, off or cycle outlet groups
Outlet group operations:
You can group one or multiple outlets on this page using
. See
Creating an Outlet Group
(on page 118).
The Outlet Groups page will list all outlet groups you create.
Then you can perform one of the following actions on one or multiple outlet groups:
Power on, off or cycle the selected group(s). See
Outlet Group Power Control
(on page 118).
Observe the power status of each outlet group and/or power status of each member outlet.
Re-name a group or change its member outlets. See
Modifying an Outlet Group
(on page 121).