
6
User manual
www.connectinglegacy.com
WARNING!!
Remember that this Pack is heavy so please be careful when
removing it from the package,or install it .
No.
Description
Silk-screen
Remark
1
Pack positive pole
P+
Output terminal
2
Pack negative pole
P-
Output terminal
3
LCD
4
LCD key
5
handle
6
Fixed bracket
7
reset
RST
Press and hold for 3 seconds to turn the battery on/off; long
press for 6 seconds to reset the battery system
8
Run LED indication
RUN
9
ALARM LED indication
ALM
Lift heavy objects
10
Capacity LED indication
11
DRY connect port
DRY CONTACT
12
485A communication port
RS485A
Connect to inverter
13
CAN communication port
CAN
Connect to inverter
14
RS232 communication port
RS232
Host software
15
RS485B communication port
RS485B
Parallel use
16
ADS Coder
ADS
Set Battery address code
17
Air switch
ON/OFF
18
Power switch
ON/OFF
5. Installation
5.1.
Selecting Mounting Location
Consider the following points to install the energy storage Pack:
Do not mount the Pack on flammable construction materials.Mount on a solid surface;
Install this Pack module at eye level in order to allow the readability of LCD display at all times.
For proper air circulation to dissipate heat, please leave a gap of about
>
0.3 meter from the ground,30 cm
from the side of the device.
The ambient temperature should be between 0°C and 40°C and relative humidity should be between 25%
and 85% to ensure optimal operation.
The recommended installation is flat wise adherence.
Install the battery module in a dry, protected area with no excessive dust and sufficient air circulation. Do not
operate in locations where the temperature and humidity are outside the specified range.
5.2.
Mounting The PACK
When installing the Pack bracket, use appropriate screws to fix it. After that, the equipment should be
firmly bolted.The pack can be run indoors or outdoors. However, only professional personnel can enter
this area for installation or maintenance.
Step 1:
When receiving the product, first check whether all parts are complete, if not, please report to the Dealer .
Step 2:
Ensure that the Pack is installed on the Rack.Choose a suitable installation location and require the battery pack
to be placed at a safe.
The first load-bearing plate should be at least 15cm away from the ground. The distance between the load-