Lower
Guide
Bar
Figure 4-22. Lower Guide Bar Gauge
Avoid low limbs, power lines, and
other objects that can endanger crew or paver.
Components operate in both automatic and manual
mode.
The paver can operate using one side only. Material
from the opposite side cannot be augered to the
working side. It is possible to leave both cut-off gates
shut and open the endgates on the screed for paving
potholes and patching.
Basic Paving
1. Follow the start-up procedure.
(Page 4-4)
2. Position paver at the starting point for the mat.
3. Adjust screed as needed.
(Page 4-12)
4. Open cut-off gates under auger.
(Page 4-15)
5. Open hopper wings.
(Page 4-14)
NOTE: Allow only a partial load of asphalt to enter
the hopper when first starting to pave.
6. Turn the left and right conveyor sonic paddle
switches to the PADDLE position and set speed
using the right and left conveyor dials. The conveyor
speed can be adjusted while paving if needed.
NOTE: When in the AUTO mode, the conveyors will
operate at the selected speed but will turn on
and off when using the sonic auger. (Page
4-15)
7. Turn the left and right auger switches AUTO, using
the dials to control the pile height at the endgate.
(Page 3-6)
8. When the material starts moving into the sonic
range, the auger speed will slow proportionately
and turn off, then turn back on when the material
level drops.
NOTE: The pile height must be set to the highest
point when the endgates are closed. When
the endgates are open, the pile height will
lower to prevent material from pushing in
front of the endgates.
9. When the material begins to discharge from under
the screed, set the screed lift switch to the FLOAT
position.
(Page 3-6)
10. Begin paving, moving slowly at first to adjust the
screed if needed.
11. Make a paving pass until the asphalt level in the
hopper is low.
Never back up with cut-off gates open.
NOTE: To prevent excessive handwork, set the left
and right conveyor sonic paddle switches
to the OFF position and set both cut-off
switches to the CLOSE position about three
feet from the end of the pull to prevent
excessive handwork.
12. Return paver back to starting position to begin the
next pull.
13. Position and set the screed endgate on the joint
side back to “0” feet, or flush with bottom of the
screed.
14. Repeat these steps as you continue to pave.
4
Operation
LeeBoy 8616B Conveyor Paver
4-17
Summary of Contents for 8616B
Page 2: ......
Page 12: ...LeeBoy 8616B Conveyor Paver xii NOTES...
Page 14: ...NOTES LeeBoy 8616B Conveyor Paver 1 2...
Page 40: ...NOTES LeeBoy 8616B Conveyor Paver 2 16 Information and Specifications...
Page 42: ...NOTES LeeBoy 8616B Conveyor Paver 3 2 Component Location...
Page 115: ...NOTES LeeBoy 8616B Conveyor Paver 5 42...
Page 117: ...NOTES 6 2 Schematics...
Page 119: ...LeeBoy 8616B Conveyor Paver 6 4 Schematics NOTES...
Page 121: ...LeeBoy 8616B Conveyor Paver 6 6 Schematics NOTES...
Page 123: ...LeeBoy 8616B Conveyor Paver 6 8 Schematics NOTES...
Page 125: ...LeeBoy 8616B Conveyor Paver 6 10 Schematics NOTES...
Page 127: ...LeeBoy 8616B Conveyor Paver 6 12 Schematics NOTES...
Page 129: ...LeeBoy 8616B Conveyor Paver 6 14 Schematics NOTES...
Page 131: ...LeeBoy 8616B Conveyor Paver 6 16 Schematics NOTES...
Page 133: ...LeeBoy 8616B Conveyor Paver 6 18 Schematics NOTES...
Page 135: ...LeeBoy 8616B Conveyor Paver 6 20 Schematics NOTES...
Page 137: ...LeeBoy 8616B Conveyor Paver 6 22 Schematics NOTES...
Page 139: ...LeeBoy 8616B Conveyor Paver 6 24 Schematics NOTES...
Page 141: ...LeeBoy 8616B Conveyor Paver 6 26 Schematics NOTES...
Page 143: ...LeeBoy 8616B Conveyor Paver 6 28 Schematics NOTES...
Page 145: ...LeeBoy 8616B Conveyor Paver 6 30 Schematics NOTES...
Page 147: ...LeeBoy 8616B Conveyor Paver 6 32 Schematics NOTES...
Page 149: ...LeeBoy 8616B Conveyor Paver 6 34 Schematics NOTES...
Page 151: ...LeeBoy 8616B Conveyor Paver 6 36 Schematics NOTES...
Page 153: ...LeeBoy 8616B Conveyor Paver 6 38 Schematics NOTES...
Page 155: ...LeeBoy 8616B Conveyor Paver 6 40 Schematics NOTES...
Page 157: ...LeeBoy 8616B Conveyor Paver 6 42 Schematics NOTES...
Page 159: ...LeeBoy 8616B Conveyor Paver 6 44 Schematics NOTES...
Page 161: ...LeeBoy 8616B Conveyor Paver 6 46 Schematics NOTES...
Page 163: ...LeeBoy 8616B Conveyor Paver 6 48 Schematics NOTES...
Page 165: ...LeeBoy 8616B Conveyor Paver 6 50 Schematics NOTES...
Page 167: ...LeeBoy 8616B Conveyor Paver 6 52 Schematics NOTES...
Page 169: ...LeeBoy 8616B Conveyor Paver 6 54 Schematics NOTES...
Page 171: ...LeeBoy 8616B Conveyor Paver 6 56 Schematics NOTES...
Page 286: ......