Lechler DroplegUL User Manual Download Page 2

Position Description

No

1

Mounting Clamp

1

2

Dropleg Tube with adapter

1

3

Connecting hose

1

Items in the kit

Required tools for assembly:

n

Wrench size 14mm and 10mm (twice)

1. Assembly of mounting clamp to spray boom

Fix plates to the boom

considering rowspacing

of the crop. Screw soft

to avoid deformation of

the plates.

If length of the screws is

not sufficient use a

thread bar (best in

stainless steel to avoid

corrosion - not included

in the delivery).

Greasing the screws

eases assembly and

disassembly.

Take care to assemble

in a way that avoids any

collision when boom is

folded. 

ATTENTION:

For increased stability

please mount the was-

her between cotter pin

and adapter.

Manual Dropleg

UL

2. Assembly of Dropleg

UL

Connect Dropleg

UL

with

mounting clamp, put

washer on the belt and

secure with cotter pin.

Position nozzle body to

the rear of direction of

sprayer (see figure 

besides). 

Otherwise you may

cause damage to the

Dropleg

UL

and the

boom.

3. Connect the Dropleg

UL

to the liquid 

system of the boom

Use connection hose to

fit with nozzle body.

First connect bayonett

cap with gasket to the

nozzle body. Then 

unscrew blue nut of 

Dropleg

UL 

adapter, put it

on the hose, fit hose

onto the connector and

rescrew the nut 

(14 mm AF).

ATTENTION: 

Do not

overtorque the hose -

see picture.

4. Folding the boom

When folding or unfol-

ding the boom Dropleg-

s

UL

should fold freely.

Especially when unfol-

ding the boom take care

that the 

Droplegs

UL

do not get

caught up. 

If necessary  fit moun-

ting clamps alternating

on boom segments. 

Avoid the connection

hose being bent. If re-

quired shorten the hose.

5. Road 

transportation

During transit take care

that Droplegs

UL

do not

touch the ground. In

case boom is too low tie 

Droplegs

UL

up or 

disassemble. If possible

lock boom in a higher

transport position.

Take care of the regio-

nal regulations accor-

ding transportation. 

6. Use in the field

Droplegs

UL

should be

positioned in a way that

they can move freely

during spraying bet-

ween the rows.

Take care not to hit the

ground with the boom

during operation in

order to avoid damage.

Droplegs

UL

can move

backwards when tou-

ching ground. We re-

commend a 

minimum clearence of

80 cm between boom

and ground. 

Lechler GmbH 

.

Agricultural Nozzles and Accessories

P.O. Box 13 23 

72544 Metzingen, Germany 

Phone +49 7123 962-0 

Fax+49 7123 962-480 

[email protected] 

www.lechler-agri.com

10

/1

5-

Sc

.

77

38

18

 

Su

bj

ec

t t

te

ch

ni

ca

l m

od

ific

at

io

ns

.

Droplegs should be sto-

red even on the ground

or best hanged-up.

Store Dropleg

UL

frost-

free or winterize them.

Purge remaining fluid in

Dropleg

UL

pipe.

7. Storing the  

Droplegs

UL

Position 1

Position 3

Position 2

   

   

 

 

Fahrtrichtung

< < < < < < < <

Direction of travel

Nozzle tips 

(not included):

n

TwinSpray Cap with

ID/IDN, IDK/IDKN,

FT, LU

n

IDKT

n

DF

For adjustment of

nozzle tips optionally

use templet part num-

ber 092.163.42.10.30

Reviews: