Installation of the system:
Place the solar panel to the pole and fasten lightly with 6pcs M8 ×16 screws.
Product Installation
3
4
Ø76
±
2
Ø25
600
1
2
3
4
5
Face solar panel in the desired direction and fasten the M8 x 16 screews.
Picture 6
3. Split type activation and installation:
Drill holes on the pole.
Firstly, determine
and mark the AE3 panel and LED light
position according to the optimum sun
radiation. Drill a Ф25mm hole approximately
600mm down from the top of the pole, where
the light is to be installed. (See Picture 8)
Attach the bracket to the AE3 unit.
Thread
the cables from the hole on the bracket and set
the proper angle in which the solar panel can
obtain maximum energy from the sun (each
scale on the bracket is 6 degree). Fix the bracket
to the solar panel by fastening a M12 × 85 bolt.
(See Picture 9)
Thread 2 pieces of 2m waterproof cables through the Ф25mm hole which was made in step one
and then out from the top of the pole.
Mount the LED light:
Mount the LED light on
Connect the LED light with corresponding cables.
the pole by 4pcs M8 90 bolts.
×
The maximum torque for those M8 bolts is 14Nm. Do not surpass
this torque specification. (See Picture 10)
Mount the AE3 panel:
Connect the two cables from the top of the pole to the solar panel and install
the solar panel ensuring you do not pinch any cables use 6pcs M8 x 16 screws to secure the bracket
to the pole.(See Picture 10)
Picture 9
Picture 8
10
9
Picture 10
5
Activate solar panel as per Operation Instructions (Page 5)