background image

 

Operating the Stadium Hazer 

 

Switching the Stadium Hazer on using the mains switch at the rear of the machine will instigate an automatic cleaning 
routine. This cycles the Hazer through an increased temperature mode in order to purge existing fluid and any surface matter 
that may be present. The machine will then switch back into a state of readiness. 
 
Should the fluid require priming into the machine, this will occur under normal operation, but can be achieved quicker by 
having the haze set to maximum output. 
 
Site the Machine in a desired position and use the side pull latch in order to set up the required haze output direction. 
*(please see acceptable operating environment conditions) * (view pictorial operational guide). 
 
For Manual operation set the Haze switch to ‘on’ and adjust the Haze control for the desired output ( 10 steps from Zero to 
Max) and adjust the Fan output for the desired distance of dispersion. 
(Note that Haze output steps 1 to 5 will only use one vapour tube.. this increases the overall operating efficiency, and allows 
for optimum performance) 
 
The Fan can be set to a sweep mode by rotating the fan speed control quickly between low – high – low within 2 seconds of 
Haze switch on. The highest fan speed during the sweep will be as set by the fan speed control. 
 
DMX512 merely requires that the address of the Haze channel be set via the rotary address selector switches, (control panel) 
and the correct DMX signals applied. The subsequent channel will control the Blower fan speed. Please note that the DMX 
address is set at machine switch on time. Any changes should therefore be set by switching the machine off and on again. 
This prevents accidental re allocation. 
 
0 – 10V operation can be achieved by applying these analog signals to pin2 and pin3 of the external input XLR connector on 
the control Panel. All control signals prioritise to that of the highest level. 

Summary of Contents for Stadium Hazer

Page 1: ...Stadium Hazer Operating Manual ...

Page 2: ...abilities combined with an electronically adjustable blower fan make this unit one of the most versatile and self contained units on the market Virtually instant start up means that the Hazer can be rapidly deployed Extremely high output means that venue fill times are extremely short The patented haze process is performed by a combination of high quality fluid and air pump control combined with a...

Page 3: ...hot fluid could issue close to the machine Never aim at persons or allow such operating conditions to occur and maintain a 3m safety clearance There are ventilation holes on the top and at the rear of the machine these should not be covered or obstructed Similarly the internal fan inlet holes underneath the chassis cowl on the top of the main chassis The machine should be electrically earthed and ...

Page 4: ... tube Virtually Instant Operation Fluid Capacity 10 Litres Fluid Use Max 500cc Hr Min 50cc Hr Blower Air Flow Max 600m3 h Min 20m3 h Haze Flow direction 30 degrees to 90 degrees Control DMX 5122 channels Haze and Fan External 0 10v Haze and Fan Manual Haze and Fan Multiple Microprocessor Control Modular Construction Switched Mode Power Supplies for vapour tube energy Can be supplied with detachabl...

Page 5: ...uires the changing the empty bottle for a new one Use the screw lid to seal the used bottle and dispose of correctly Re filling the empty bottle is not advised as this can lead to the introduction of foreign particles which may reduce the efficiency of the external in line filter If it is felt that there is a reduction in the performance of the machine then this filter should be un plugged from th...

Page 6: ...Zero to Max and adjust the Fan output for the desired distance of dispersion Note that Haze output steps 1 to 5 will only use one vapour tube this increases the overall operating efficiency and allows for optimum performance The Fan can be set to a sweep mode by rotating the fan speed control quickly between low high low within 2 seconds of Haze switch on The highest fan speed during the sweep wil...

Page 7: ...ormal circumstances and with secure bottle caps the case has been designed for this purpose Spare bottle caps can be kept in the free storage area Two fixed conduit tubes within the same area can be used to protect the bottle fluid feed tubes whilst travelling The fluid fill tubes can be cleaned with a damp cloth before storing If external power fans blowers are to be used then these should not be...

Page 8: ...al devices All such devices have reduced life spans under adverse temperature and humidity conditions It is always wise to minimise risky operating environments and provide the machine with similar conditions as would be applicable to any other electronic apparatus Good conditions include Dry Free from dust etc stable non vibrating non flammable surroundings well ventilated normal temperature non ...

Page 9: ...nip the nylon ties holding the silicon feed tubes onto the pipe and push the tubing off Release the M4 lock nut on the front brass terminal block and undo the M4 cap head bolt using a driver size 3 hex key Release but do not fully undo the M4 bolt securing the terminal clamp to the input end of the tube Phillips screwdriver and small M4 spanner Unplug the appropriate thermocouple lead centre tube ...

Page 10: ...10 Keep the fluid filter clean If the machine is to be in a fixed installation make sure that it meets the working environmental conditions and that it is monitored by qualified personnel ...

Page 11: ...11 Pictorial Guides Rear machine mains switch Fluid Filters ...

Page 12: ...12 Control Panel Arm Lock Adjustment ...

Page 13: ...13 Tube Replacement Assistive Pictures Top cover removed Twin tube layout indicating front and rear fixings Temperature sensor plug in points ...

Page 14: ...14 LE MAITRE WARRANTY CONDITIONS To be supplied ...

Reviews: