greater than the rated charging power of the controller If the input power exceeds the rated charging power of the
controller, the controller will charge the battery according to the rated charging power of the controller. The actual
operation power of PV array meets the following conditions:

When the actual operating power of the PV array is less than the rated charging power of the controller,
the controller operates at the maximum power point of the PV array.

If the power of the PV array is greater than the rated charging power of the controller, the operation
time at full power of the controller will be extended, so more energy can be obtained to charge the
battery.

Attention:When the input wiring of PV array is correct and the actual power is more than 2
times of the rated power of the controller, the controller may be damaged. When the input
of PV array is reversed and the current actual power is more than 1.5 times of the rated

power of the controller, the controller will be damaged.

4.Fixation of controller

1) The controller should be installed well-ventilated place, avoid direct sunlight, high temperature and do

not install in location where water can enter the controller. If it is to be sealed installation, please ensure
that the box can be reliably cooled.

2) Please select correct screw to fix the controller on the wall or other platform. Screw M4 or M5, Screw cap

diameter less than 10mm.

3) Please reserve enough space between the wall and controller, at least 150 mm up and down to allow for

cooling and cable connection.

4) The mounting holes distance is

176mm*226mm

,diameter of hole is 5mm.

5) Aluminum fins for natural cooling, we strong suggest hanging installation, this is better for air flow

cooling effect.

5.Controller Connection

Before connecting, make sure that the system voltage matches with the selected products, and
whether the open circuit voltage and maximum power of the PV array are within the reasonable
range of the controller.

The following order of connection please do not free change

,

The controller has the function of

automatic identification of battery voltage. The battery should be connected first, otherwise it
may cause system voltage identification error.

All terminals are in tight status after factory, in order to well connected, please loose all terminals
at first.

If there is a short circuit at the terminal of the controller, it may cause fire or explosion! Please
operate with caution! It is strongly recommended to add air switches or fuses between the
battery and the controller and between the solar panel and the controller, and disconnect all air
switches or fuses before wiring (the air switch or fuse shall be selected according to 1.5 ~ 2
times of the rated current of the controller)

In order to avoid fault installation, please refer to below procedure

1) As shown in the figure, connect the positive wire of the battery to battery positive terminal of the

controller(terminal 8), and the negative wire to battery negative terminal of the controller(terminal 7). The
connecting wire between the battery and the controller shall be as short as possible, and the recommended
distance is between 30cm and 100cm.

2) As shown in the figure, connect the positive wire of photovoltaic array to PV positive of the

controller(terminal 5), and the negative wire to PV negative of the controller(terminal 6).

3) Insert the standard external temperature sensor of the controller into terminal 10 of the controller. The

controller collects the temperature of the battery through the temperature sensor to compensate the

Summary of Contents for TD150V

Page 1: ...eam series User s manual of MPPT solar charge controller MAX PV Input voltage 150V 12V 24V 48V 50A 60A Dear Users Thank you for selecting our product Please read this manual carefully before you use this product ...

Page 2: ...l time and improve the energy utilization of solar energy system It can be used in communication base station household system street light system and monitoring system and so on Perfect electronic protection function and patent terminal structure can avoid the damage of components and due to system fault and installation error Advanced MPPT technology fast and stable track the Maximum Power Point...

Page 3: ...e connection Overcharging Over discharging Over voltage Overload Short circuit Overtemperature 25mm2 connectors red and black connector distinguish plus and minus Using standard Modbus communication protocol based on RS 485 communication bus maximize satisfaction different occasions communication need Optional Blue tooth or WiFi communication module through the mobile phone APP can view and set th...

Page 4: ... temperature compensation 2 USB to RS485 Communication line Optional Special cable for connecting controller communication interface RJ45 interface and USB interface of PC the standard line length is 1 5 meters it can also be customized according to the user s needs The controller can be real time monitored and parameters set by the special upper computer software 3 Bluetooth module Optional The c...

Page 5: ... battery will be destroyed This product have limited solar panel input power function in theory no matter how much power of solar panel input the controller will limited the input power under rated power but must pay attention to the following two points 1 The short circuit of solar panel less than rated current of controller 2 The Open Circuit Voltage of solar panel increased with decreasing temp...

Page 6: ... installation this is better for air flow cooling effect 5 Controller Connection Before connecting make sure that the system voltage matches with the selected products and whether the open circuit voltage and maximum power of the PV array are within the reasonable range of the controller The following order of connection please do not free change The controller has the function of automatic identi...

Page 7: ...oller monitoring software operation manual 6 Start Controller Note the controller supports starting the controller from the photovoltaic array end When the automatic battery identification function is selected starting the photovoltaic array terminal first may make the controller identify the system voltage error Before connecting the power supply please confirm whether the wiring of battery termi...

Page 8: ...MPPT mode and gradually reduce the charging current the boost charging continued 2H then go to float charging mode Due to the load capacity and generated changing the controller can t keep constant voltage charging the constant voltage charging time will be accumulated accumulate 2hours cancel boost charging mode Float Charging After entering the floating charging mode the controller will reduce t...

Page 9: ...show battery voltage PV array voltage charging current battery type temperature of environment each parameter keep 3s Long press or button could speed loop display At the main interface short press OK button could on or off the Dry contact At the main interface long press MENU and 5S could show work log short press or could see times of LVD working days times of over current protection time of HVD...

Page 10: ...hen the Load Working Time set to 24hours the load will keep working 24hours in no fault status When the load working time set to 23H it means the load start timer or sensor function If the battery capacity is enough the load will be started at sunset The load will work under timer setting hours or stop working till sunrise 8 Temperature Detection inside controller When the inside temperature of co...

Page 11: ...e since the controller can be started from the photovoltaic array end the controller will be damaged when the photovoltaic array is connected right and the battery end is reversed Battery Over Voltage Protection When the battery voltage reaches the over voltage cut off point the controller will automatically stop charging and discharging the battery to prevent the battery and load from being damag...

Page 12: ...rature 138V PV Max input power 12V 660W 24V 1320W 48V 2640W 12V 800W 24V 1600W 48V 3200W MPPT Voltage range VBAT 2V 120V MPPT tracking accuracy 99 5 Controller conversion efficiency Max 98 MPPT limited Power Output Yes Self consumption 2W Max Charging current 50A 60A LVD 11 0V ADJ 9V 12V 2 24V 4 48V LVR 12 6V ADJ 11V 13 5V 2 24V 4 48V Float voltage 13 8V ADJ 13V 15V 2 24V 4 48V Boost voltage 14 4V...

Page 13: ...Appendix一 Mechanical dimension drawing Uunit mm ...

Reviews: