background image

RECEIVER CONNECT

1. S.BUS and PPM receiver

Summary of Contents for FLYBALL 230

Page 1: ...installation Flyball installation steps 6 through joints connect to be bottom half ball As shown in the figure the battery panel and A B block are assembled by fixing with M2 9 screws and affixed with four single sided buffer glue 130GT leftover pieces ...

Page 2: ...3 Soldering Flyball soldering Connect the two sections of 16 power cord weld XT60 and set the heat shrinkable tube for heat sealing ...

Page 3: ...Divided 300mm red black line into two parts and added tin at both ends Tin added on 12V soldering joint Set the heat shrinkable tube to heat seal ...

Page 4: ...m red and black wire welding COB lamp belt Note black ball with blue tape red ball with red tape Welding of 1 4P LED hum assembly line and 3 color row line Add heat shrinkable tube separately after welding ...

Page 5: ...Cut off the 3P plug and solder it to the programming lamp Marking of welding points ...

Page 6: ...he power cord is soldered to the lower pad of the ESC and the BEC 70mm wire is soldered to the upper pad of the ESC Note The notch of the tube seat faces to the arc center 600mm 6 7 Teflon tube passes through the wide tube seat narrow tube seat lens seat narrow tube seat and wide tube seat from left to right ...

Page 7: ...mp penetrates through the notch of the tail tube seat exits from the right side of the tube seat then penetrates the Teflon tube and sets it into the tube seat Insert the tube into the left side of the tube seat ...

Page 8: ...B lamp set onto the bottom half ball Note Avoid bending the lamp tube when adjusting the tube seat Install the frame onto tube seats by fixing screws M2 9 round head screws were used on the yellow circle M2 12 cup head screws were used on the red circle ...

Page 9: ...ht cord to the side arm Tie the power cord with a cable tie Plug in the receiver cable and thread the plug to the bottom for the receiver version paste it on top of the flight controller tie it with a cable tie and paste the antenna on the end of the cable tie ...

Page 10: ... lines so that the rotation of the propeller should not be affected 8 The installation of protective cover on upper flyball 11 black pentagons and 1 red pentagon form the upper ball if it is a red ball then it is 11 red and 1 white Install the A B tail lamp socket and fix the B socket with M2 9 round head screws and nuts ...

Page 11: ...9 Upper and lower protective cover rear LED assembly Thread the rear light into a 70mm Teflon tube and then assemble it to the rear light holder ...

Page 12: ... original fly Super_S F4 tower M2 25 screws with M2 30 screws and use spacers and screws to assemble the VTX as shown in the figure below 2 Install the camera RunCam nano 2 with M2 3 5 screws and mark the flight control port connected in a red frame KKT20 V200 ...

Page 13: ...RECEIVER CONNECT 1 S BUS and PPM receiver ...

Page 14: ...2 iBUS receiver 3 DSM2 and DSMX receiver ...

Page 15: ...BETAFLIGHT Please go to the Google App Store to download and install the BETAFLIGHT Assistant Software ...

Reviews: