Installation steps
1.
Bottom cover assembly
2. Frame installation
Flyball installation steps
6 through joints
connect to be
bottom half ball
As shown in the figure,
the battery panel and
A-B block are assembled
by fixing with M2*9
screws, and affixed with
four single-sided buffer
glue
(130GT
leftover
pieces).