LCUT Creative B 00-34 OO Quick Start Manual Download Page 4

PAGE 4 OUT OF 4 

Diagram above shows the assembly of the stairs, stair balcony, and the priv. 
 
Take care as the parts are thin and fragile. Start with the balcony floor. Use the 3 provided 
strips to build up the thickness on the sides and front. Glue the supports to the bottom (making 
sure to clear the lower door). Glue that assembly to the signal box. 
 
Assemble the stairs by first inserting the steps in the side parts making sure not to use too 
much force. Use glue as lubricant to make the insertion easier. The stairs can be put together 
to suit either the left or right version of the signal box (left shown). Assemble them mirrored for 
the right version. 
 
Put the priv together and finish off with the leftover ridge tiles. Glue to the signal box making 
sure it clears the upper door. 
 
Finally glue the staircase to the balcony. The right angle balustrade should overlap the priv a 
little bit. 
 
Finished signal box shown below. 

Reviews: